王 岩,杨晓光.基于交通安全的交叉口倒计时信号灯设置研究[J].中国安全科学学报,2006,16(3):55-59,70 WANG Yan,YANG Xiao-Guang.Discussion on setting traffic signals with counting down display unit at intersection based on traffic safety[J].China Safety Science Journal,2006,16(3):55-59,70.(in Chinese)
[2]
余 璇.交叉口信号控制安全的研究[D].上海:同济大学,2008. YU Xuan.Research on intersection signal control safety[D].Shanghai:Tongji University,2008.(in Chinese)
GB 14886―2006,道路交通信号灯设置与安装规范[S]. GB 14887―2011,Specification for setting and installation of road traffic signals[S].(in Chinese)
[5]
GA/T508―2004,道路交通信号倒计时显示器[S]. GA/T508―2004,Road traffic counting down display unit[S].(in Chinese)
[6]
Limanond T,Prabialook P,Tippayawong K.Exploring impact of countdown timers on traffic operations and driver behavior at a signalized intersection in Bangkok[J].Transport Policy,2010,17(6):420-427.
[7]
张 杰,贺玉龙,孙小端,等.城市路口倒计时显示对驾驶行为的影响分析[J].交通信息与安全,2009,27(5):99-101. ZHANG Jie,HE Yu-long,SUN Xiao-duan,et al.Effects of countdown signal at urban intersection on driving behaviors[J].Journal of Transport Information and Safety,2009,27(5):99-101.(in Chinese)
[8]
马天宇.信号交叉口倒计时显示屏对驾驶员行为影响分析[D].长春:吉林大学,2008. MA Tian-yu.Study on the effect of countdown display unit on driving behavior at signalized intersection[D].Changchun:Jinlin University,2008.(in Chinese)
[9]
钱红波,韩 皓.机动车绿灯倒计时对交叉口交通安全的影响研究[J].中国安全科学学报,2010,20(3):9-13. QIAN Hong-bo,HAN hao.Influence of countdown of green signal on traffic safety at crossing[J].China Safety Science Journal,2010,20(3):9-13.(in Chinese)
[10]
Ibrahim M R,Karim M R,Kidwai F A.The effect of digital count-down display on signalized junction performance[J].American Journal of Applied Science,2008,5(5):479-482.
[11]
Limanond T,Chookerd S,Roubtonglang N.Effects of countdown timers on queue discharge characteristics of through movement at a signalized intersection[J].Transportation Research Part C:Emerging Technologies,2009,17(6):662-671.
[12]
Chiou Y C,Chang C H.Driver responses to green and red vehicular signal countdown displays:safety and efficiency aspects[J].Accident Analysis and Prevention,2010,42(4):1057-1065.
[13]
Lum K M,Harun H.A before-and-after study on green signal countdown device installation [J].Transportation Research Part F:Traffic Psychology and Behavior,2006,9(1):29-41.
[14]
贾俊平,何晓群,金勇进.统计学[M].北京:中国人民大学出版社,2007. JIA Jun-ping,HE Xiao-qun,JIN Yong-jin.Statistics[M].Beijing:China Renmin University Press,2007.(in Chinese)
[15]
马莹莹,杨晓光,曾 滢.城市道路车道宽度与车速分布关联性分析[J].同济大学学报:自然科学版,2009,37(12):1621-1626. MA Ying-ying,YANG Xiao-guang,ZENG Ying.Association analysis of urban road free-flow speed and lane width[J].Journal of Tongji University:Natural Science,2009,37(12):1621-1626.(in Chinese)