杨小兵.混凝土收缩徐变预测模型研究[D].武汉:武汉大学,2004. YANG Xiao-bing.Study on prediction model of concrete shrinkage and creep[D].Wuhan:Wuhan University,2004.(in Chinese)
[9]
Takács P F.Deformations in concrete cantilever bridges:observations and theoretical modelling[D].Norway:The Norwegian University of Sciencs and Technology,2002.
[10]
颜东煌,田仲初,李学文,等.混凝土桥梁收缩徐变计算的有限元方法与应用[J].中国公路学报,2004,17(2):55-58. YAN Dong-huang,TIAN Zhong-chu,LI Xue-wen,et al.Calculation of shrinkage and creep of concrete bridge finite element method and application of[J].China Journal of Highway and Transport,2004,17(2):55-58.(in Chinese)
[11]
周绪红,乔 朋,狄 谨,等.大跨径简支转连续箱梁桥收缩徐变效应[J].交通运输工程学报,2009,9(2):39-44. ZHOU Xu-hong,QIAO Peng,DI Jin,et al.Shrinkage and creep effects of long-span simple-supported-to-contnuous box girder bridge[J].Joumal of Traffic and Tansportation Engineering,2009,9(2):39-44.(in Chinese)
[12]
Dezi L,Leoni G,Tarantino A M.Time-dependent analysis of prestressed composite beams[J].Journal of Structural Engineering,1995,121(4):62l-633.
[13]
Meyerson R.Compressive creep of prestressed concrete mixtures with and without mineral admixtures[D].Blacksburg:Virginal Tech,2001.
[14]
Mcdonald D B,Roper H.Accuracy of predication models for shrinkage of concrete[J].ACI Materials Journal,1993,56(5):265-271.
[15]
Gardner N J,Zhao J W.Creep and shrinkage revisited[J].ACI Materials Journal,1993,90(3):36-46.
[16]
Gardner N J,Lockman M J.Design provisions for drying shrinkage and creep of normal-strength concrete[J].ACI Materials Journal,2001,98(2):159-167.
[17]
JTGD 62―2004,公路钢筋混凝土与预应力混凝土桥涵设计规范[S]. JTGD 62―2004,Code for design of highway reinforced concrete and presterssed concrete bridges and culverts[S].(in Chinese)
Feng J H.Reinforced concrete bridge deck fatigue under truck wheel load[D].Detroit:Wayne State University,2003.
[20]
Wang C S,Dong X H,Miao W H,Li G.Fatigue safety evaluation of existing reinforced concrete bridges[J].Key Engineering Materials,2009(413-414):749-756.
[21]
王春生,周 江,吴全友,等.既有混凝土桥梁疲劳寿命与使用安全评估[J].中国公路学报,2012,25(6):101-107. WANG Chun-sheng,ZHOU Jiang,WU Quan-you,et al.Fatigue life and service safety assessment for existing concretc bridges[J].China Journal of Highway and Transport,2012,25(6):101-107.(in Chinese)
[22]
宋玉普.混凝土结构的疲劳性能及设计原理[M].北京:机械工业出版社,2006. SONG Yu-pu.Fatigue behavior and design principle of concrete structures[M].Beijing:Machinery Industry Press,2006.(in Chinese)
[23]
Batchelor B V,Hewitt B E,Csagoly P.An investigation of the fatigue strength of deck slabs of composite steel/concrete bridge[J].Transportation Research Record,1978(664):153-161.
[24]
Okada K,Okamura H,Sonoda K.Fatigue failure mechanism of reinforced concrete bridge deck slabs[J].Transportation Research Record,1978(664):136-144.
[25]
Sonoda K,Horikawa T.Fatigue strength of reinforced concrete slabs under moving loads[C]//IABSE.Proceedings of the IABSE colloquium,Fatigue of steel and concrete structures.Lausanne:IABSE,1982:455-462.
[26]
Tanihira T,Sonoda K,Horikawa T,Kitoh H.Low cycle fatigue characteristics of bridge deck RC slabs under the repetition of wheel loads[C]//New Zealand Concrete Society.Proceedings of Pacific concrete conference.New Zealand:New Zealand Concrete Society,1988:381-392.
[27]
Perdikaris P C,Beim S,Bousias S.Slab continuity effect on and fatigue strength of R/C bridge deck models[J].ACI Structural Journal,1989,86(4):483-491.