LOW C, MSU C M, HUANG K I. Benefits of lot splitting in Job Shop scheduling[J]. International Journal of Advanced Manufacturing Technology,2004,24(9/10):773-780.
[2]
PAN Quanke, ZHU Jianying. Optimization method for a Job Shop scheduling problem with alternative machines in the batch process[J]. Chinese Journal of Mechanical Engineering,2004,40(4):36-39(in Chinese).[潘全科,朱剑英.多工艺路线的批量生产调度优化[J].机械工程学报,2004,40(4):36-39.]