HARTMANN S, BRISKON D.A survey of variants and extensions of the resource-constrained project scheduling problem[J]. European Journal of Operational Research,2010,207(1):1-14.
[2]
PENG Wuliang, WANG Chengen. Resource-constrained DT-CTP and its algorithm solution[J]. Computer Integrated Manufacturing Systems,2008,14(11):2155-2160(in Chinese).[彭武良,王成恩.资源受限的离散时间/成本平衡问题及其遗传算法求解[J].计算机集成制造系统,2008,14(11):2155-2160.]