CHUNG K J, HOU K L. An optimal production run time with imperfect production process and allowable shortages[J]. Computers&Operations Research,2003,30(4):483-490.
[2]
CHIU S W, TING C K, CHIU Y S P. Optimal production lot sizing with rework, scrap rate, and service level constraint[J]. Mathematical Tical and Computer Modelling,2007,46(3):535-549.