基于资源的过程多目标折衷优化

, PP. 0-0

Keywords: 过程优化,关键路径法,资源约束,遗传算法

Full-Text   Cite this paper   Add to My Lib

Abstract:

为实现一定资源环境下过程的时间、成本和质量的折衷优化,提出了以资源为协调因子的解决方法。在过程的活动定义中加入了成本、质量和支持资源属性,并定义活动时间、成本和质量分别为其支持资源的函数;通过控制每个活动的支持资源的数量与质量来控制活动的时间、成本和质量;利用关键路径法,通过在多个活动中合理分配资源来使整个过程的时间、成本和质量达到折衷。

References

[1]  XU Xiaofei,TIAN Yuhua,XUE Jinsong,et al.Computer integrated manufacturing system newly knowledge explanation[M].Beijing:Publishing House of Ordnance Industry,2000(in Chinese).[徐晓飞,田雨华,薛劲松,等.计算机集成制造系统(CIMS)知识新解[M].北京:兵器工业出版社,2000.]
[2]  SHOUMAN M A, El-NOUR A, EBRAHIM S, et al. Mixed integer linear programming model for a time cost trade-off[J]. Advances in Modelling & Simulation, 1991,22(4):53-63.
[3]  ERENGUC S, SELCUK T.Time/cost trade-off problems with discounted cash flows using generalized benders decomposition[J].Naval Research Logistics, 1993, 40(1):25-50.
[4]  FENG Chungwei, LIU Liang, BURNS S A.Stochastic construction time-cost trade-off analysis[J]. Journal of Computing in Civil Engineering, 2000, 14(2):117-126.
[5]  ICMELI O, ERENGUC S S. Resource constrained time/cost tradeoff project scheduling problem with discounted cash flows[J]. Journal of Operations Management, 1996,14(3):255-275.
[6]  LIU Wei,LIU Jingquan. Study on time-cost trade-offs problem under limited resource[J].System Engineering Theory and Practice, 2002, 22(9):42-46 (in Chinese).[刘伟,刘景泉. 资源约束下的时间-费用交换问题研究[J]. 系统工程理论与实践, 2002,22(9):42-46.]
[7]  HECHT M, HANDAL J. A discrete-event simulator for predicting outage time and costs as a function of maintenance resources[A]. Proceedings of the Annual Reliability and Maintainability Symposium[C ].2002,612-617.
[8]  ZHOU Yonghua, CHEN Yuliu. Trade-off model among time, quality and cost for business process reengineering[J]. Computer Integrated Manufacturing Systems,2002, 8(4):269-273(in Chinese).[周永华 ,陈禹六.经营过程重构的时间、质量和成本折衷模型[J].计算机集成制造系统,2002, 8(4):269-273.]
[9]  BABU A J G,SURESH N. Project management with time, cost and quality considerations[J]. European Journal of Operational Research, 1996,88(2):320-327.
[10]  KHANG D B, MYINT Y M. Time, cost and quality trade-off in project management: A case study[J]. International Journal of Project Management, 1999, 17(4):249-256.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133