CAO Jian,ZHAO Haiyan,ZHANG Youliang,et al.Research on task scheduling method for product cooperativer design[J].China Mechanical Engineering,1999,10(5):489-492(in Chinese).[曹健,赵海燕,张友良,等.产品协同设计中的任务调度方法研究[J].中国机械工程,1999,10(5):489-492.]
[2]
ZHANG Hui,CHENG Tao,HU Yujin,et al.Approach of the task assign to the alliances of virtual manufacture[J].MIE of China,2003,(7):90-94(in Chinese).[张辉,程涛,胡于进,等.虚拟制造组 织中的任务分配问题[J].中国制造业信息化,2003,(7):90-94.]
[3]
YE Dan.Modeling methods and group decision support systems for agile virtual enterprise organization optimaiztion[D].Harbin:Harbin Institute of Technology,2000(in Chinese).[叶丹.面向敏捷 虚拟企业组织优化的建模方法及群体决策支持系统[D].哈尔滨:哈尔滨工业大学,2000.]
[4]
LIU Nairuo,DONG Jinxiang,LI Shanping,et al.Design of a goal-oriented model for project management in ZD-PDM[J].Journal of Computer Research & Development,1999,36(10):1274-1280(in Chinese).[刘乃若,董金祥,李善平,等.ZD-PDM中面向目标的项目管理模型的设计[J].计算机研究与发展,1999,36(10):1274-1280.]
[5]
LIU Chunlin,HE Jianmin.An algorithm for selection of the most critical path in a project network[J].Journal of Systems Engineering, 2000,15(2):136-142(in Chinese).[刘春林,何建敏.模糊计划 网络最关键路的求取算法[J].系统工程学报,2000.15(2):136-142.]