VERNADAT F B.Enterprise modeling and integration(EMI):current status and research perspectives[J]. Annual Reviews in Control, 2002,26(1):15-25.
[2]
CHEN Y L, TSENG M. A stair-like CIM system architecture[J]. IEEE Transactions on Components, Packaging, and Manufacturing Technology–Part C, 1997,20(2):101-110.
SONG Zhigang, LUO Jianbin, DENG Xian, et al. Design and implementation of the cost management information system of manufacturing industry based on ABC theory[J]. Computer Engineering, 2002,28(7):214-216(in Chinese).[宋志刚,骆建彬,邓宪,等.基于作业成本理论的制造业成本信息系统设计与实现[J].计算机工程,2002, 28(7): 214-216.]
[6]
PENG Can. Overview and prospect of the study on justification techiques for AMT in overseas[J]. Systems Engineering-Theory Methodology Applications,1997,4(6):61-67(in Chinese).[彭灿.国外先进制造技术(AMT)评价研究综述及展望[J].系统工程理论方法应用,1997,4(6):61-67.]
[7]
SAATY T L.The analytic hierarchy proces[M].New York,NY,USA:McGraw-Hill, 1980.