YAN Haoyun, LI Hongyu. Due date assignment method based on load-oriented manufacturing control(LOMC) technique[J]. Computer Integrated Manufacturing Systems,2008,14(6):1200-1205(in Chinese).[严浩云,李宏余.基于面向负荷的生产控制的交货期设置方法[J].计算机集成制造系统,2008,14(6):1200-1205.]
[2]
XIA Yueqin, TANG Renzhong, PANG Yan. Research on production planning and scheduling for semi-process industry[J]. Modular Machine Tool & Automatic Manufacturing Technique,2003(1):4-6(in Chinese).[夏悦琴,唐任仲,庞严.半流程型企业的生产作业计划制定与调度研究[J].组合机床与自动化加工技术,2003(1):4-6.]