LIAO Ren, CHEN Qingxin, MAO Ning. Genetic algorithm for resource-constrained project scheduling[J]. Computer Integrated Manufacturing Systems,2004,10(7):815-819(in Chinese).[廖仁,陈庆新,毛宁.模具虚拟企业项目调度遗传算法研究[J].计算机集成制造系统,2004,10(7):815-819.]
[2]
FANG Wei, OU Lixiong. Study on multiple new product projects resource allocation[J]. Journal of Industrial Engineering and Engineering Management,2005,19(S1):6-10(in Chinese).[方炜,欧立雄.多项目环境下新产品研发项目资源分配问题研究[J].管理工程学报,2005,19(S1):6-10.]