LZACK C, AVISHAI M, AVRAHAM S. Multi project scheduling and control:a process-based comparative study of the critical chain methodology and some alternatives[J].Project Mangement Journal,2004,35(2):39-50.
[2]
TIAN Jun, KOU Jisong, LI Minqiang. Using genetic algorithms to optimize the resources in arrow network techniques[J]. Systems Engineering—Theory & Practice,1999,19(5):56-60(in Chinese).[田军,寇纪凇,李敏强.利用遗传算法优化施工网络计划[J].系统工程理论与实践,1999,19(5):56-60.]