GOLDRATT E M.Computerized shop floor scheduling[J].International Journal of Production Research,1988,26(3): 443-55.
[2]
HE Ting,LIU Fei,MA Yulin,et al.Study on shop-floor scheduling[J].Chinese Jounal of Mechanical Engineering,2000,36(5):97-102(in Chinese).[何霆,刘飞,马玉林.车间生产调度问题研究[J].机械工程学报,2000,36(5):97-102.]