WANG Yunli, XIAO Tianyuan, DUAN Guanghong, et al. Multi-Agent technology in manufacturing: a state of the art survey[J].Computer Integrated Manufacturing Systems, 2001,7(10):17(in Chinese). [王云莉,肖田元,段广洪,等.智能领域多智能体系统的技术研究[J].计算机集成制造系统,2001,7(10):17.]
[2]
LIN Huiping, FAN Yushun, WU Cheng. Research of integrated planning and scheduling based on hierarchy scheduling model[J].Computer Integrated Manufacturing Systems, 2002, 8(8):602606(in Chinese). [林慧苹,范玉顺,吴澄. 基于分层调度模型的生产计划和调度集成研究[J]. 计算机集成制造系统, 2002,8(8):602606. ]