WANG Zhongbing, WANG Ningsheng, CHEN Yuliu. Research on dynamic CAPP system and its decision about manufacturing resource[J]. China Mechanical Engineering, 2006, 5(9):779-782(in Chinese). [王忠宾, 王宁生, 陈禹六. 动态CAPP系统及其加工资源决策方法的研究[J]. 中国机械工程, 2006, 5(9):779-782.]
[2]
JIN Xing, CHEN Gang, DONG Jinxiang. Scheduling of activity in multi-projects management model with resource constraints[J]. Computer Engineering,2001,27(9):71-72(in Chinese). [金星, 陈刚, 董金祥. 资源受限下多项目管理软件模型中任务的调度[J]. 计算机工程, 2001, 27(9):71-72.]