LAN H,ROSS P,CORNE D. A promising genetic algorithm approach to job-shop scheduling, rescheduling and open-shop scheduling problems [A]. Proceedings of the Fifth International Conference on Genetic Algorithms [C]. San Manto: Morgan Kaufmann, 1993. 375-382.
[2]
TADAM I H, MASUDA T. Two scheduling problems with fuzzy due dates [J]. Fuzzy Sets and Systems, 1992,46(3):339-347.
[3]
[日]玄光男,程润伟.遗传算法与工程设计[M].北京:科学出版社,2000.
[4]
SAKAWA M, KUBOTA R. Fuzzy programming for multi-objective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms [J]. European Journal of Operational Research, 2000,(120):393-407.
[5]
FORTEMPS P,ROUBENS M. Ranking and defuzzification methods based on area compensation [J]. Fuzzy Sets and Systems, 1996, (82):319-330.
[6]
KUBOTA A. Study on optimal scheduling of manufacturing system by genetic algorithms [D]. Japan:Ashikaga Institute of Technology,1995.