KIM K H, SONG J Y, WANG K H. A negotiation based scheduling for items with flexible process plans[J]. Computers Ind. Engng., 1997, 33(3/4): 785-788.
[2]
GINDY N N, SAAD S M, YUE Y. Manufacturing responsiveness through integrated process planning and scheduling[J]. Int. Jour. Production Research, 1999, 37(11): 2399-2418.
[3]
KIM K H, EGBELU P J. Scheduling in a production environment with multiple process plans per job[J]. Int. Jour. Production Research, 1999, 37(12):2725-2753.
[4]
TSOURVELOUDIS N C, PHILLIS Y A. Manufacturing flexibility measurement: a fuzzy logic framework[J]. IEEE Trans. on Robotics and Automation, 1998, 14(4):513-524.
[5]
CHAN F T S. Evaluations of operational control rules in scheduling a flexible manufacturing system[J]. Robotics and Computer-Integrated Manufacturing, 1999, 15: 121-132.
[6]
GOYAL S K, MEHTA K, KODAL R, et al. Simulation for analysis of scheduling rules for a flexible manufacturing system[J]. Integrated Manufacturing Systems, 1995, 6(5):21-26.
[7]
BAKER A D. A survey of factory control algorithms that can be implemented in a multi-agent heterarchy: dispatching, scheduling, and pull[J]. Journal of Manufacturing Systems, 1998, 17(4): 297-320.
[8]
KOUISS K, PIERREVAL H, MEBARKI N. Using multi-agent architecture in FMS for dynamic scheduling[J].Journal of Intelligent Manufacturing, 1997, 8:41-47.
[9]
PENDHARKAR P C. A computational study on design and performance issues of multi-agent intelligent systems for dynamic scheduling environments[J]. Expert Systems with Applications, 1999, 16:121-133.
[10]
SOUSA P, RAMOS C. A distributed architecture and negotiation protocol for scheduling in manufacturing systems[J].Computers in Industry, 1999, 38:103-113.