KLIEM R L, LUDIN I S. Reducing project risk. [M]. England:Gower, 1997.
[2]
BIER V M, HAIMES Y Y, LAMBERT J H, et al. Survey of approaches for assessing and managing the risk of extremes [J]. Risk Analysis, 1999, 19 (1): 83-94.
[3]
HAIMES Y Y. Risk modeling, assessment and management (2nd edition)[M]. New York, NY, USA: Wiley, 2004.
[4]
LU Youjie, LU Jiayi. Project risk management [M]. Beijing: Tsinghua University Press,1998(in Chinese).[卢有杰,卢家仪. 项目风险管理[M]. 北京:清华大学出版社,1998.]
[5]
PARK K H, FAVREL J. Virtual enterprise-information system and networking solution [J]. Computers and Industrial Engineering, 1999, 37(1): 441-444.
[6]
DAVIS M, O′SULLIVAN D. Systems design framework for the extended enterprise [J]. Production Planning and Control, 1999, 10(1): 3-18.
[7]
HUANG M, YANG H, WANG X. Genetic algorithm and fuzzy synthetic evaluation based risk programming for virtual enterprise [J]. Acta Automatica Sinica, 2004,30(3): 449-454.
[8]
HUANG Min, YANG Hongmei, WANG Xingwei. Fuzzy synthetic evaluation based risk evaluation for virtual enterprise[J]. Mathematics in Practice and Theory,2004,34(6):45-51(in Chinese).[黄敏,杨红梅,王兴伟.基于模糊综合评判的虚拟企业风险评价[J]. 数学的实践与认识,2004, 34(6):45-51.]
[9]
WANG Ling. Intelligent optimization algorithms with applications [M].Beijing:Tsinghua University Press,Springer Press,2001(in Chinese).[王凌.智能优化算法及其应用[M].北京:清华大学出版社,施普林格出版社, 2001.]
[10]
MA Liang. Ant algorithm-optimization strategy from the insect colony [J]. Journal of Nature, 1999, 21(3) : 161-163(in Chinese).[马良.来自昆虫世界的寻优策略——蚂蚁算法[J].自然杂志,1999,21(3):161-163