WATSON K J, BLACKSTONE J H, GARDINER S C. The evolution of a management philosophy:the theory of constraints[J]. Journal of Operations Management,2007,25(2):387-402.
[2]
ZUO Yan, GU Hanyu, XI Yugeng. Modified bottleneck-based heuristic for large-scale Job-Shop scheduling problems with a single bottleneck[J]. Journal of Systems Engineering and Electronics,2007,18(3):556-565.