LIANG Xu, WANG Jia, HUANG Ming. New coding method for massive production scheduling problem[J].Computer Integrated Manufacturing Systems,2008,14(10):1974-1982(in Chinese).[梁旭,王佳,黄明.解决大规模生产调度问题的一种新编码方法[J].计算机集成制造系统,2008,14(10):1974-1982.]
[2]
YU Xiaoyi, SUN Shudong, CHU Wei. Parallel collaborative evolutionary genetic algorithm for multi-workshop planning and scheduling problems[J]. Computer Integrated Manufacturing Systems,2008,14(5):991-1000(in Chinese).[于晓义,孙树栋,褚巍.基于并行协调进化遗传算法的多协调车间计划调度[J].计算机集成制造系统,2008,14(5):991-1000.]