JONES A, RABELO L C. Survey of job shop scheduling techniques[M]. MD:National Institute of Standards and Technology, Gaithersburg,1998.
[2]
WU S H,FUH J Y H,NEE A Y C. Concurrent process planning and scheduling in distributed virtual manufacturing[J].IIE Transactions,2002,34:77-89.
[3]
FRAYRET J M,AMOURS S D,MONTREUIL B,CLOUTIER L. A network approach to operate agile manufacturing systems[J]. Int. Jour. Production Economics,2001,74:239-259.
[4]
LEITO P,RESTIVEO F. An agile and cooperative architecture for distributed manufacturing systems[J].In Proceedings of the IASTED International Conference Robotics and Manufacturing[C].Cancun, Mexico, 2001.188-193.
[5]
ZENG Bo,YANG Jianjun. GPGP coordination mechanisms application in shop-floor scheduling systems based on MAS[J].Chinese Journal of Mechanical Engneering,2001,37(8):80-83(in Chinese).[曾波 ,杨建军. GPGP协同机制在基于MAS车间调度系统中的应用[J].机械工程学报,2001,37(8):80-83.]
[6]
GRABO B,GENESTE L. Dispatching rules in scheduling: a fuzzy approach[J]. Int. Jour. of Production Research,1994,32(4):903-915.
[7]
ZHANG Shuguang,FANG Jin,QIAN Quan,CAI Qingsheng. A model of case matching method in case-based reasoning[J].PR&AI,2002,15(3):348-350(in Chinese).[章曙光,方瑾,钱权,蔡庆生. 基于范例推理中的一种范例匹配方法模型[J].模式识别与人工智能,2002,15(3):348-350.]
[8]
ZHU Jianying.Non-classical mathematics for intelligent system[M].Wuhan:Huazhong University of Science and Technology,2000(in Chinese).[朱剑英.智能系统非经典数学方法[M].武汉:华中科技大学出版社,2000.]