HOMEM de Mello L, LEE S, EDITORS. Computer-aided mechanical assembly planning[M]. Kluwer,1991.
[2]
FAZIO T L De,WHITNEY D E. Simplified generation of all mechanical assembly sequences[J]. IEEE Journal of Robotics and Automation, 1987,3(6):640-658.
[3]
BAI Fangni, LI Lei,et al. Research on generation of assembly sequences based on decomposition of graph[J]. Mechanical Science and Technology,2000,19(6):1035-1037(in Chinese).[白芳妮,李磊,等.基于图分解的装配序列生成算法研究[J].机械科学与技术, 2000,19(6):1035-1037.]
[4]
CHANG Kaihsiung, WEE W G.A knowledge-based planning system for mechanical assembly using robots[J]. IEEE Expert, 1988, 3(1):18-30.
[5]
LAZZERINI B,MARCELLONI F. A genetic algorithm for generating optimal assembly plans[J].Artificial Intelligence in Engineering,2000,14(4):319-329.
[6]
HAN Shuihua, LU Zhengding, CHEN Chuanbo. Automatic assembly process planning based on geometric inference[J]. Journal of Computer Aided Design and Computer Graphics,2000,12(7):528-532(in Chinese).[韩水华,卢正鼎,陈传波.基于几何推理的装配序列自动规划研究[J].计算机辅助设计与图形学学报,2000,12(7):528-532.]
[7]
JONES R E, WILSON R H. On constraints in assembly planning[J]. IEEE Transactions on Robotics and Automation,1998,16(6):849-863.
[8]
DINI G,SANTOCHI M. Automatic sequencing and subassembly detection in assembly planning[J]. Annals of the CIRP, 1992, 41(12):3447-3465.
[9]
LIU Shixin, WANG Mengguang, TANG Jiafu. The optimization algorithms for solving resource-constrained project scheduling problem:a review[J]. Control and Decision, 2001,16(11):647-651(in Chinese).[刘士新,王梦光,唐加福.资源受限工程调度问题的优化方法综述[J].控制与决策,2001,16(11):647-651.]
[10]
XIAO Weishu. Graph theory and the algorithm[M]. Beijing:Aviation Industry Press,1993.221-247(in Chinese).[肖位枢. 图论及其算法[M]. 北京:航空工业出版社,1993.221-247.]