中华人民共和国铁道部.新建时速300~350 km客运专线铁路设计暂行规定(上、下)[S].北京:中国铁道出版社,2007.Ministry of Railways of the People s Republic of China.Design provisional regulations on newly-built passenger line railway atthe speed of 300~350 km[S].Beijing:China Railway Publishing House,2007.(in Chinese)
[2]
中华人民共和国铁道部.TB10082—2005铁路轨道设计规范[S].北京:中国铁道出版社,2005.Ministry of Railways of the People s Republic of China.TB10082—2005 code for design of railway track[S].Beijing:ChinaRailway Publishing House,2005.(in Chinese)
[3]
徐冬健.盾构隧道沉降数值模拟[D].北京:北京交通大学土木建筑工程学院,2009.XU Dong-jian.The numerical simulation of shield tunneling settlement[D].Beijing:College of Civil Engineering of BeijingJiaotong University,2009.(in Chinese)
[4]
张云,殷宗泽,徐永福.盾构法隧道引起的地表变形分析[J].岩石力学与工程学报,2002,21(3):388-392.ZHANG Yun,YING Zong-ze,XU Yong-fu.Analysis on three-dimensional ground surface deformation due to shield tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2002,21(3):388-392.(in Chinese)
[5]
张印涛,陶连金,边金.盾构隧道开挖引起地表沉降数值模拟与实测分析[J].北京工业大学,2006,32(4):333-336.ZHANG Yin-tao,TAO Lian-jin,BIAN Jin.Analysis of the numerical simulation of ground movement induced by the shieldtunneling[J].2006,32(4):333-336.(in Chinese)
[6]
陶连金,孙斌,李晓霖.超近距离双孔并行盾构施工的相互影响分析[J].岩石力学与工程学报,2009,28(9):1856-1861.TAO Lian-jin,SUN Bin,LI Xiao-lin.Interaction analysis of double holes extremely close approaching parallel shield tunnelsconstruction[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(9):1856-1861.(in Chinese)
[7]
丁铭绩.高速铁路CFG桩桩板复合地基工后沉降数值模拟[J].中国铁道科学,2008,29(3):1-5.DING Ming-ji.Numerical simulation on the post-construction settlement of CFG pile-lab composite foundation in high-speedrailway[J],2008,29(3):1-5.(in Chinese)
[8]
中国建筑科学研究院.JGJ79—2002建筑地基处理技术规范[S].北京:中国建筑工业出版社,2002.China Academy of Building Research.JGJ79—2002 technical code for ground treatment of buildings[S].Beijing:ChinaArchitecture&Building Press,2002.(in Chinese)