肖汝诚,项海帆.斜拉桥索力优化的影响矩阵法[J].同济大学学报,1998,26(3):236-240.XIAO Ru-cheng,XIANG Hai-fan.Influence matrix method of cable tension optimization for cable-stayed bridges[J].Journalof Tongji University,1998,26(3):236-240.(in Chinese)
[4]
梁鹏,肖汝诚,张雪松.斜拉桥索力优化实用方法[J].同济大学学报,2003,31(11):1270-1274.LIANG Peng,XIAO Ru-cheng,ZHANG Xue-song.Practical method of optimization of cable tensions for cable-stayed bridges[J].Journal of Tongji University,2003,31(11):1270-1274.(in Chinese)
[5]
JANJIC D,PIRCHER M,PIRCHER H.Optimization of cable tensioning in cable-stayed bridges[J].Journal of BridgeEngineering,2003,8(3):131-137.
[6]
童林,李传习,上官兴.钢管混凝土拱梁组合体系桥吊杆成桥索力的确定[J].长沙交通学院学报,2004,20(3):11-15.TONG Lin,LI Chuan-xi,SHANGGUAN Xing.Calculation of suspender tensile force of the concrete filled steel tubular beamarch-bridge[J].Journal of Changsha Communications University,2004,20(3):11-15.(in Chinese)
[7]
肖汝诚,项海帆.斜拉桥索力优化及其工程应用[J].计算力学学报,1998,15(1):118-125.XIAO Ru-cheng,XIANG Hai-fan.Optimization method of cable prestresses of cable-stayed bridges and its engineeringapplications[J].Chinese Journal of Computational Mechanics,1998,15(1):118-125.(in Chinese)