谢国强.地下工程信息化施工发展现状及对策[J].科技创新导报,2008(21):20.XIE Guo-qiang.Development situation and countermeasure of information construction for underground engineering[J].Science and Technology Innovation Herald,2008(21):20.(in Chinese)
[3]
井浩,佘芳涛,邵生俊,等.箱涵顶进施工安全监测与控制技术研究[J].地下空间与工程学报,2007,3(8):1404-1407.JING Hao,SHE Fang-tao,SHAO Sheng-jun,et al.Research on measuring and controlling technology of box culver-jacking[J].Chinese Journal of Underground Space and Engineering,2007,3(8):1404-1407.(in Chinese)
[4]
朱合华,姜勇,夏才初,等.复杂地质条件下隧道信息化施工综合技术研究[J].岩石力学与工程学报,2002,21(增刊2):2548-2553.ZHU He-hua,JIANG Yong,XIA Cai-chu,et al.Study on tunnel construction informational technology in complicated geological condition[J].Chinese Journal of Rock Mechanics and Engineering,2002,21(Suppl 2):2548-2553.(in Chinese)
[5]
黄生根,张健,张晓炜.超大型箱涵顶进引起的地层位移规律[J].岩土力学,2009,30(2):387-392.HUANG Sheng-gen,ZHANG Jian,ZHANG Xiao-wei.Research on soil displacement regulations with jacking method for super-large shallow-buried box culvert[J].Rock and Soil Mechanics,2009,30(2):387-392.(in Chinese)
[6]
PHILIP J C,DAVID G A.Microtunneling techniques to form an in-situ barrier around existing structures[C]∥Proceedings of the Annual International Conference.Las Vegas:[s.n.],1994:386-394.
[7]
ABOLMAALI A,GARG A K.Effect of wheel live load on shear behavior of precast reinforced concrete box culverts[J].Journal of Bridge Engineering,2008,13(1):93-99.
[8]
GARG A K,ABOLMAALI A.Finite-element modeling and analysis of reinforced concrete box culverts[J].Journal of Transportation Engineering,2009,135(3):121-128.
[9]
MAXIMOS H,ERDOQMUS E,TADROS M K.Fatigue evaluation for reinforced concrete box culverts[J].ACI Structural Journal,2010,107(1):13-20.
[10]
PIMENTEL M,COSTA P,FLIX C,et al.Behavior of reinforced concrete box culverts under high embankments[J].Journal of Structural Engineering,2009,135(4):366-375.
[11]
KANG J,PARKER F,KANG Y J,et al.Effects of frictional forces acting on sidewalls of buried box culverts[J].International Journal for Numerical and Analytical Methods in Geomechanics,2008,32(3):289-306.
[12]
孙钧,虞兴福,孙旻,等.超大型“管幕-箱涵”顶进施工过程中土体变形的分析与预测[J].岩土力学,2006,27(7):1021-1027.SUN Jun,YU Xing-fu,SUN Min,et al.Analysis and prediction on soft ground deformation of a super-large shallow buried“pipe-roofing and box-culvert”jacking project under construction[J].Rock and Soil Mechanics,2006,27(7):1021-1027.(in Chinese)
[13]
姚大钧,吴志宏,张郁慧.软粘土中管幕工法之设计与分析[J].岩石力学与工程学报,2004,23(增刊2):4999-5005.YAO Da-jun,WU Zhi-hong,ZHANG Yu-hui.Design and analysis of pipe roofing method in soft clay[J].Chinese Joumal of Rock Meehanics and Engineering,2004,23(Suppl 2):4999-5005.(in Chinese)
饶为国.管棚-大断面箱涵暗顶技术在下穿公路工程中的应用及分析[J].土木工程学报,2008,41(4):106-111.RAO Wei-guo.Application and analysis of forepoling and large-section box culvert jacking for underpass highway construction[J].China Cival Engineer Journal,2008,41(4):106-111.(in Chinese)