黄俊,张顶立.水底隧道穿越风化槽技术及施工效应研究[J].公路,2005(6):203-207. HUANG Jun, ZhANG Ding-li. A study on technique of benlhic tunnel traversing weathered trough and its construction effect[J]. Highway, 2005(6): 203-207. (in Chinese)
[2]
张顾立,李治国.高压富水区隧道帷幕注浆止浆系统分析[J].岩土力学,2004,25(7):1151-1154. ZHANG Ding-li, LI Zhi-guo. Analysis of borehole occluding system for tunnel curtain grouting in high pressure and rich water zone[J]. Rock and Soil Mechanics, 2004, 25(7): 1151-1154. (in Chinese)
[3]
曾超,张建斌.厦门翔安(海底)隧道土建工程简介[C]∥海底与水下隧道国际学术交流会.北京:北京交通大学, 2005. ZENG Chao, ZHANG jian-bin. Introduction of xiamen Xiang'An subsea tunnel civil engineering[C]// International Confer ence on the Undersea Tunnels. Beijing: Beijing Jiaotong University, 2005. (in Chinese)
[4]
郭小红.对厦门东通道海底隧道几个技术问题的探讨[C]∥海底与水下隧道国际学术交流会,北京:北京交通大学, 2005. GUO Xiao-hong. A study on several technical problems of xiamen Xiang'An subsea tunnel[C]//International Conference on the Undersea Tunnels. Beijing: Beijing Jiaotong University, 2005. (in Chinese)