ROEDER C W,HAWKINS N M.Connections between steel frames and concrete walls[J].AISC Engineering Journal, 1981,18(1):22-29.
[2]
SHAHROOZ B M,DEASON J T,TUNC G.Cyclic behavior of outrigger beam-wall connections[C]//Proceedings of 6th ASCCS Conference Vol.2.Los Angeles,March,2000:785-792.
[3]
李国强,曲冰,孙飞飞,等.高层建筑混合结构钢梁与混凝土墙节点低周反复加载试验研究[J].建筑结构学报,2003,24(4):1-7.LI Guo-qiang,QU Bing,SUN Fei-fei,et al.Cyclic loading tests of steel beam to concrete wall joints in steel-concrete mixed structures[J].Journal of Building Structure,2003,24(4):1-7.(in Chinese)
[4]
赵均,张宝泉,陈向东,等.钢桁架与混凝土墙单剪板连接预埋件构造形式的抗震性能试验研究[J].建筑结构学报,2006,27(2):33-39.ZHAO Jun,ZHANG Bao-quan,CHEN Xiang-dong,et al.Experimental study on the seismic behavior of details of embedded anchors for the single-plate connection between steel truss and concrete wall[J].Journal of Building Structure,2006,27(2): 33-39.(in Chinese)
黄嘉,苗启松,侯光瑜.钢桁架(钢梁)与混凝土墙间单剪板连接的约束弯矩研究[J].建筑结构学报,2006,27(2):15-19.HUANG Jia,MIAO Qi-song,HOU Guang-yu.Research on restraining moment of single-plate connection between RC wall and steel truss(steel girder)[J].Journal of Building Structure,2006,27(2):15-19.(in Chinese)
[7]
叶列平,郑从立,蔡益燕,等.钢-混凝土墙铰接连接节点嵌固弯矩的分析与计算[J].建筑结构学报,2006,27(5):30-38.YE Lie-ping,ZHENG Cong-li,CAI Yi-yan,et al.Analysis of partially restrained moment at bolted connection joint of steel beam to concrete wall[J].Journal of Building Structure,2006,27(5):30-38.(in Chinese)
[8]
郑从立,叶列平.钢梁-混凝土墙铰接节点栓钉预埋件的设计计算[J].建筑结构,2006,36(1):43-46.ZHENG Cong-li,YE Lie-ping.Design method of the headed studs embed steel parts at the pinned joint of steel beam to concrete wall[J].Building Structure,2006,36(1):43-46.(in Chinese)