BLUMENFELD D E,WEISS G H.Merging from an acceleration lane[J].Transportation Science,1970,4(1):161-168.
[3]
曹荷红.高速公路互通式立交变速车道研究[D].北京:北京工业大学建工学院,1999.CAO He-hong.Study on the accderation lane length of freeway interchange[D].Beijing:College of Arechitecture and Civil Engineering of Beijing University of Technology,1999.(in Chinese)
[4]
DAGANZO C F.Estimation of gap acceptance parameters within and across population from direct roadside observation[J]. Transportation Research,1979,15B:1-15.
[5]
吴兵.互通式立交通行能力及延误研究[D].上海:同济大学交通运输学院,1996.WU Bing.Study on the capacity and delay of freeway interchange[D].Shanghai:College of Transportation of Tongji Uni- versity,1996.(in Chinese)
[6]
KYTE M,DIXON M,BASAVARAJU P M.Why field measurements differ from model estimates[J].Transportation Re- search Record,1852:32-39.
[7]
HAGRING O.Estimation of critical gaps in two major streams[J ].Transportation Research,2000,34 (B):293-313.
[8]
杨振海,杨明哲.数理统计基础[M].北京:北京工业大学出版社,1991.
[9]
HIDEYUKI Kita.Effect of merging lane length on the merging behavior at expressway on ramps[C]//DAGANZO C F. Transportation and Traffic Theory.Berkeley USA:Elsevier Science,1993:37-51.