索穹顶结构施工过程时变力学分析

Keywords: 索穹顶结构,施工过程,时变力学,几何非线性

Full-Text   Cite this paper   Add to My Lib

Abstract:

为了解决索穹顶结构施工过程分析的难题,应用非线性时变有限元方法对索穹顶结构施工过程进行了分析,全过程跟踪分析索穹顶结构在各施工阶段的力学性状,得出施工过程杆件内力和节点位移的演变规律,得出不考虑施工过程的时变效应对结构设计偏于不安全的结论,为该类结构的设计和施工提出指导性建议.

References

[1]  曹志远.土木工程分析的施工力学和时变力学基础[J].土木工程学报,2001,34(3):41-46.CAO Zhi-yuan.Construction mechanics and time-varying mechanics in civil engineering[J].China Civil Engineering Journal, 2001,34(3):41-46.(in Chinese)
[2]  胡振东,曹志远.时变元法及其应用[J].固体力学学报,2002,23(1):104-108.HU Zheng-dong,CAO Zhi-yuan.Time-varying element method and its application[J].Acta Mechanica Solida Sinica, 2002,23(1):104-108.(in Chinese)
[3]  崔晓强,郭彦林,叶可明.大跨度钢结构施工过程的结构分析方法研究[J].工程力学,2006,23(5):83-88.CUI Xiao-qiang,GUO Yan-lin,YE Ke-ming.Research on the construction mechanic method of long-span steel structures [J].Engineering Mechanics,2006,23(5):83-88.(in Chinese)
[4]  张毅刚,张建华.索穹顶结构施工成形全过程计算机仿真分析[C]//第13届全国工程建设计算机应用学术会议论文集,广州:华南理工大学出版社,2006.ZHANG Yi-gang,ZHANG Jian-hua.Simulation of construction process for cable dome[C]//Proceedings of computer tech- nique application on engineering construction,Guangzhou:South China University of Technology Press,2006.(in Chinese)
[5]  张建华,张毅刚.ANSYS二次开发技术在索穹顶结构计算程序中的应用[J].四川建筑科学研究,2007,33(3):21- 24.ZHANG Jian-hua,ZHANG Yi-gang.Application of the secondary development of ANSYS in cable dome computation pro- gram design[J].Sichuan Building Science,2007,33(3):21-24.(in Chinese)
[6]  张毅刚,薛素铎,杨庆山,等.大跨空间结构[M].北京:机械工业出版社,2005.
[7]  TERRY W R.Georgia dome cable roof construction techniques[C]//Proceedings of IASS-ASCE International Symposium. Atlanta:[s.n],1994.
[8]  LEVY M P.The georgia dome and beyond achieving lightweight-long span structure[C]//Proceedings of IASS-ASCE inter- national symposium.Atlanta:[s.n],1994.
[9]  唐建民,沈祖炎.圆形平面轴对称索穹顶结构施工过程跟踪计算[J].土木工程学报,1998,31(5):24-32.TANG Jian-min,SHEN zu-yan.The research of computation method of construction process simulation for axial symmetric cable domes with circular plane[J].China Civil Engineering Journal,1998,31(5):24-32.(in Chinese)
[10]  袁行飞,董石麟.索穹顶结构施工控制反分析.建筑结构学报[J],2001,22(2):74-78.YUAN Xing-fei,DONG Shi-lin.Inverse analysis of construction process of cable dome[J].Journal of Building Structures, 2001,22(2):74-78.(in Chinese)
[11]  沈祖炎,张立新.基于非线性有限元的索穹顶施工模拟分析[J].计算力学学报,2002(4):466-471.SHEN Zu-yan,ZHANG Li-xin.Simulation of erection procedures of cable dome based on nonlinear FEM[J].Chinese Journal of Computational Mechanics,2002(4):466-471.(in Chinese)
[12]  罗尧治,沈雁彬.索穹顶结构初始状态的确定和成形过程分析[J].浙江大学学报,2004,38(10):1322—1327.LUO Yao-zih,SHEN Yan-bin.Initial configuration determination of cable dome structure and analysis of it's configuration process[J].Journal of Zhejiang University,2004,38(10):1322-1327.(in Chinese)
[13]  曹志远.时变力学及其工程应用[J].力学与实践,1999,21(5):1-4.CAO Zhi-yuan.Time-variation mechanics and its application in engineering[J ].Mechanics and Engineering,1999,21(5): 1-4.(in Chinese)
[14]  GEIGER D H.The design and construction of two cable domes for the korean olympics[C]//Proceedings of IASS-ASCE In- ternational Symposium on Shells,Membranes and Space Frames.Osaka:[s.n],1986.
[15]  董石麟,罗尧治,赵阳.新型空间结构分析设计与施工[M].北京:人民交通出版社,2006.