杨耀辉,马昕,周予启.中国石油大厦复合土钉支护现场监测与分析[J].岩土工程技术,2006,20(1):9-12.YANG Yao-hui,MA Xin,ZHOU Yu-qi.Field measurements and theoretical analysis on internal force of composite soil-nailing at zhongshiyou foundation pit[J].Geotechnical Engineering Technique,2006,20(1):9-12.(in Chinese)
[2]
张钦喜,佟德凯,熊宗喜,等.亚奥广场护坡桩内力及锚杆拉力监测与分析[J].北京工业大学学报,2006,32(2):368-372.ZHANG Qin-xi,TONG De-kai,XIONG Zong-xi,et al.Measurement and analysis on the stress in retaining pile and theforce of anchor at a deep excavation of YA-AO building[J].Journal of Beijing University of Technology,2006,32(2):368-372.(in Chinese)
[3]
张钦喜,何建勇,霍达.土钉内力计算方法探讨及实例分析[J].北京工业大学学报,2002,28(4):448-451.ZHANG Qin-xi,HE Jian-yong,HUO Da.Calculation of the interior force of soil nails and case analysis[J].Journal ofBeijing University of Technology,2002,28(4):448-451.(in Chinese)
[4]
郝文朝,高华东.北京城铁西直门车站土压力现场监测[J].建筑技术,2003,34(2):113-114.HAO Wen-chao,GAO Hua-dong.Site monitoring to earth pressure in dong-zhi-men station of Beijing metro system[J].Architecture Technology,2003,34(2):113-114.(in Chinese)
[5]
高华东,霍达,陶连金.深基坑开挖FLAC数值模拟计算及分析[J].河南科学,2005,23(6):859-862.GAO Hua-dong,HUO Da,TAO Lian-jin.Numerical calculation and analysis in deep excavation with FLAC[J].HenanScience,2005,23(6):859-862.(in Chinese)
[6]
余志成,施文华.深基坑支护设计与施工[M].北京:中国建筑工业出版社,1997:30-45.
[7]
容涛,张川,刘红岩.深基坑桩锚支护的数值模拟[J].科技情报开发与经济,2007,17(17):166-168.RONG Tao,ZHANG Chuan,LIU Hong-yan.The numerical simulation of piled-anchor support in deep foundation pit[J].Sci-Tech Information Development&Economy,2007,17(17):166-168.(in Chinese)