张晓丽.浅埋暗挖法下穿既有地铁构筑物关键技术研究与实践[D].北京:北京交通大学木建筑工程学院,2007.ZHANG Xiao-li.Research on the key technology and experience of shallow tunneling method crossing under the existingsubway tunnel[D].Beijing:School of Civil Engineering,Beijing jiaotong University,2007.(in Chinese)
[2]
张顶立,李鹏飞,侯艳娟,等.浅埋大断面软岩隧道施工影响下建筑物安全性控制的试验研究[J].岩石力学与工程学报,2009,28(1):95-102.ZHANG Ding-li,LI Peng-fei,HOU Yan-juan,et al.Experimental study on safety control of buildings during construction ofshallow-buried soft rock tunnel with large-section[J].Chinese Journal of Rock Mechanics and Engineering,2009,28(1):95-102.(in Chinese)
[3]
骆建军,张顶立,王梦恕,等.地铁施工对邻近建筑物安全风险管理[J].岩土力学,2007(7):83-87.LUO Jian-jun,ZHANG Ding-li,WANG Meng-shu,et al.Direct back analysis algorithm for deflection distribution controlduring the construction of subway[J].Rock and Soil Mechanics,2007(18,supp):83-87.(in Chinese)
[4]
易小明,张顶立,李鹏飞.隧道下穿时地表房屋变形开裂的定量评估[J].岩石力学与工程学报,2008,27(11):2288-2294.YI Xiao-ming,ZHANG Ding-li,LI Peng-fei.Quantitative evaluation of house deformation and cracks caused by tunnel-crossing[J].Chinese Journal of Rock Mechanics and Engineering,2008,27(11):2288-2294.(in Chinese)
[5]
王梦恕.地下工程浅埋暗挖技术通论[M].合肥:安徽教育出版社,2004.
[6]
四川省建设委员会.GB50292—1999民用建筑可靠性鉴定标准[S].中国建筑工业出版设,1999.Sichuan province construction committee.GB50292—1999 Stardand for appraisal of reliability of civil buildings[S].Beijing:China Architecture&Building Press,1999.(in Chinese)
[7]
侯艳娟,张顶立.浅埋大跨隧道穿越复杂建筑物安全风险分析及评估[J].岩石力学与工程学报,2007,26(增2):3718-3726.HOU Yan-juan,ZHANG Ding-li.Safety risk analysis and assessment of complex building in shallow large-span tunnelconstruction[J].Chinese Journal of Rock Mechanicals and Engineering,2007,26(Supp.2):3718-3726.(in Chinese)
逄铁铮.全程注浆在隧道穿越既有建筑物中的试验研究[J].岩土力学,2008,29(12):3451-3458.PANG Tie-zheng.Experimental study of whole process grouting used in tunnel passing through existing structures[J].Rockand Soil Mechanics,2008,29(12):3451-3458.(in Chinese)