ATTEWELL P B,WOODMAN J P.Predicting the dynamics of ground settlement and its derivatives caused by tunneling in soil[J].Ground Engineering,1982,15(8):13-20.
[3]
HAMZA N,ATA A,ROUSSIN A.Ground movements due to the construction of cut-and-cover structures and slurry shield tunnel of the Cairo Metro[J].Tunneling and Underground Space Technology,1999,14(3):47-58.
[4]
LEE K M,JI H W,SHEN C K,et al.Ground response to the construction of Shanghai metro tunnel-line2[J].Soils and Foundations,1999,39(3):113-134.
[5]
周文波.盾构法隧道施工技术及应用[M].北京:中国建筑工业出版社,2004:240-242.
[6]
张凤祥,朱和华,傅德明.盾构隧道[M].北京:人民交通出版社,2004:878-882.
[7]
张海波.地铁隧道盾构法施工对环境影响的数值模拟[D].南京:河海大学土木工程学院,2005:3-25. ZHANG Hai-bo.Numerical simulation of the influence of shield tunneling on surrounding environment[D].Nanjing:The College of Civil Engineering of Hehai University,2005.(in Chinese)
[8]
张云,殷宗泽,徐永福.盾构法隧道引起的地表变形分析[J].岩石力学与工程学报,2002,21(2):368-392. ZHANG Yun,YING Zong-ze,XU Yong-fu.Analysis on three-dimensional ground surface deformations due to shield tunnel [J].Chinese Journal of Rock Mechanics and Engineering,2002,21(2):368-392.(in Chinese)
[9]
张飞进.盾构施工穿越既有线地表沉降规律与施工参数优化[D].北京:北京工业大学建筑工程学院,2006:21-32. ZHANG Fei-jin.Shield-driven construction cross existed line ground settlement regularity & parameter optimization[D]. Beijing:The College of Architecture and Civil Engineering,Beijing University of Technology,2006:21-32.(in Chinese)