黎巍,曾向东.城市污水处理厂的技术经济综合分析与评价[J].工业安全与环保,2009,35(1):16-18.LI Wei,ZENG Xiang-dong.Technical and economiccomprehensive assessment and analysis on urban sewagetreatment plant[J].Industrial safety and environmentalprotection,2009,35(1):16-18.(in Chinese)
[2]
RENOU S,THOMAS J S,AOUSTIN E,et al.Influenceof impact assessment methods in wastewater treatment LCA[J].Journal of Cleaner Production,2008,16(10):1098-1105.
[3]
FLORES-ALSINA X,GALLEGO A,FEIJOO G,et al.Multiple-objective evaluation of wastewater treatment plantcontrol alternatives[J].Journal of EnvironmentalManagement,2010,91(5):1193-1201.
[4]
RODRIGUEZ-GARCIA G,MOLINOS-SENANTE M,HOSPIDO A,et al.Environmental and economic profile of six typologies of wastewater treatment plants[J].WaterResearch,2011,45(18):5997-6010.
[5]
CINAR O.New tool for evaluation of performance ofwastewater treatment plant:artificial neural network[J].Process Biochemistry,2005,40(9):2980-2984.
[6]
HANBAY D,TURKOGLU I,DEMIR Y,et al.Predictionof wastewater treatment plant performance based on waveletpacket decomposition and neural networks[J].ExpertSystems with Applications,2008,34(2):1038-1043.
[7]
HERNANDEZ-SANCHO F,MOLINOS-SENANTE M,SALA-GARRIDO R.Cost modelling for wastewatertreatment processes[J].Desalination,2011,268(1/2/3):1-5.
[8]
BOTTERO M,COMINO E,RIGGIO V.Application ofthe analytic hierarchy process and the analytic networkprocess for the assessment of different wastewater treatmentsystems[J].Environmental Modelling&Software,2011,26(10):1211-1224.
[9]
刘开第,李思敏,庞彦军.污水处理厂运行管理效果评价模型[J].中国给水排水,2000,16(8):45-47.LIU Kai-di,LI Si-min,PANG Yan-jun.An evaluationmodel for operation and management effect of sewagetreatment plant[J].China Water&Wastewater,2000,16(8):45-47.(in Chinese)
[10]
龚宏伟.污水处理厂运行效果的模糊综合评价[J].河北建筑工程学院学报,2005,23(4):10-13.GONG Hong-wei.The vague and comprehensiveassessment on the running effect of sewerage factory[J].Journal of Hebei Institute of Architectural Engineering,2005,23(4):10-13.(in Chinese)
[11]
蔡文.新学科《物元分析》[J].广东工学院学报,1992,9(4):105-108.CAI Wen.A new science matter elements analysis[J].Journal of Guangdong Institute of Technology,1992,9(4):105-108.(in Chinese)
[12]
邱红霞.基于熵权的灰色关联模型在水电工程评价中的应用[J].水科学与工程技术,2010(2):33-35.QIU Hong-xia.Application of grey relation model basedon entropy weight in evaluation of hydro-electric projectschemes[J].Water Sciences and EngineeringTechnology,2010(2):33-35.(in Chinese)
[13]
LU X W,LI L Y,LEI K,et al.Water qualityassessment of Wei River,China using fuzzy syntheticevaluation[J].Environ Earth Science,2010,60(8):1693-1699.
[14]
LI P Y,WU J H,QIAN H.Groundwater qualityassessment based on entropy weighted osculating valuemethod[J].International Journal of EnvironmentalScience,2010,1(4):621-630.
[15]
杨秋林,郭亚兵.水资源承载能力评价的熵权模糊物元模型[J].地理与地理信息科学,2010,26(2):89-92.YANG Qiu-lin,GUO Ya-bing,An entropy fuzzy matterelement model for assessment of water resource carryingcapacity[J].Geography and Geo-Information Science,2010,26(2):89-92.(in Chinese)
[16]
张先起,梁川.基于熵权的模糊物元模型在水质综合评价中的应用[J].水利学报,2005,36(9):1057-1061.ZHANG Xian-qi,LIANG Chuan.Application of fuzzymatter-element model based on coefficientsof entropy incomprehensive evaluation of water quality[J].Journal ofHydraulic Engineering,2005,36(9):1057-1061.(inChinese)
[17]
赵晓梅,盖美.基于熵权模糊物元的辽宁省生态环境承载力研究[J].环境科学与管理,2010,35(6):144-149.ZHAO Xiao-mei,GAI Mei.Research on ecologicalenvironmental capacity in Liaoning province base onentropy weight fuzzy matter-element model[J].Environmental Science and Management,2010,35(6):144-149.(in Chinese)
[18]
HE Y X,DAI A Y,ZHU J,et al.Risk assessment ofurban network planning in china based on the matter-element model and extension analysis[J].ElectricalPower and Energy Systems,2011,33(3):775-782.