韩振江,张建平.051基地火箭滑车轨道设计要点分析[J].中国铁路,2004,11:31-32.HAN Zhen-jian,ZHANG Jian-ping.Design featuresanalysis of the rocket sled track of 051 base[J].ChinaRailway,2004,11:31-32.(in Chinese)
[2]
张立乾,郭富民,邓广辉,等.高速试验滑轨工程设计研究[J].特种结构,2008,25(4):80-84.ZHANG Li-qian,GUO Fu-min,DENG Guang-hui,et al.Study on engineering design of high-speed test rail[J].Special Structure,2008,25(4):80-84.(in Chinese)
[3]
杨兴邦.XB高精度火箭橇试验滑轨[J].中国工程科学,2000(10):33-38.YANG Xing-bang.XB high accuracy rocket sled test track[J].China Engineering Science,2000(10):33-38.(inChinese)
[4]
杨兴邦.XB火箭橇试验滑轨的直线度评估[J].航空精密制造技术,1999,35(5):25-29.YANG Xing-bang.Straightness assessment of XB rocketsled rail[J].Aviation Precision ManufacturingTechnology,1999,35(5):25-29.(in Chinese)
[5]
王健,吴军基,陶钢.火箭橇轨道不平顺功率谱密度分析[J].弹道学报,2008,20(4):81-84.WANG Jian,WU Jun-ji,TAO Gang.Irregularity powerspectral density analysis of rocket sled track[J].Journal ofBallistics,2008,20(4):81-84.(in Chinese)
[6]
CINNAMON J D,PALAZOTTO A N.Analysis andsimulation of hypervelocity gouging impacts for a highspeed sled test[J].International Journal of ImpactEngineering,2009,36:254-262.