COZZENS K,TETZLAFF S.Using ESPCP reduces lifting costs[J].The American Oil&Gas Reporter,1998,41(6):134-137,146.
[2]
LEA J F,WINKLER H W.What is new in artificial lift[J].World Oil,1997,218(4):53-60.
[3]
KLEIN S.Advances expand application or progressive cavity pump[J].The American Oil&Gas Reporter,1995,38(6):83-85.
[4]
CHACHULA R C,ANDERSON D G.Slimhole,high volume,PC pump development for140mm cased well application[C]∥SPE International Heavy oil Symposium.Calgary:Society of Petroleum Engineers,1995:30270.
[5]
MILLS R A R.Progressing cavity oil well pump—past,present and future[J].The Journal of Canadian Petroleum Technology,1994,33(4):5-6.
[6]
殷宜平,吴壮坤,顾文忠.螺杆泵采油工艺技术应用研究[J].断块油气田,2006,13(1):82-84.YIN Yi-ping,WU Zhuang-kun,GU Wun-zhong.Application of oil recovery technique by screw pump[J].Fault-Block Oil&Gas Field,2006,13(1):82-84.(in Chinese)
[7]
谭海嵘.国内外机械采油技术发展综述[J].内蒙古石油化工,2008(4):64-66.TAN Hai-rong.The review of the artificial lift developing in the home and abroad[J].Inner Mongolia Petrochemical Industry,2008(4):64-66.(in Chinese)
[8]
MIMMI G,PENNACCHI P.Determination of tool profile for the milling of three screw pump rotors[J].Meccanica,1997,32(4):363-377.
[9]
MIMMI G,PENNACCHI P.Deviations induced by tool sharpening in the profile of three screw pump rotors[J].Meccanica,1997,32(6):567-576.
[10]
王太勇,张志强,王涛,等.复杂参数曲面高精度刀具轨迹规划算法[J].机械工程学报,2007,43(12):109-113.WANG Tai-yong,ZHANG Zhi-qiang,WANG Tao,et al.High precision tool path planning algorithm for complex parametric surface[J].Chinese Journal of Mechanical Engineering,2007,43(12):109-113.(in Chinese)
[11]
吴沁,芮执元,杨建军.复杂螺旋曲面铣削加工刀具的廓形设计[J].组合机床与自动化加工技术,2009(7):78-81.WU Qin,RUI Zhi-yuan,YANG Jian-jun.Design on contour of milling cutter in machining complex spiral curved surface[J].Modular Machine Tool&Automatic Manufacturing Technique,2009(7):78-81.(in Chinese)