盾构隧道的近接施工对已建隧道产生的影响

Keywords: 近接施工,已建隧道,内力,变形

Full-Text   Cite this paper   Add to My Lib

Abstract:

为了研究天津市软土地区新建盾构隧道近接施工对已建隧道产生的影响,以天津地铁某区间最小净距为0.98m的双线盾构隧道开挖工程为背景,采用有限元软件刚度迁移法,分析了在土体局部加固的情况下新建隧道掘进过程对已建隧道周围土体位移及衬砌内力与变形的影响,并将地表变形计算结果与实测数据进行了对比分析.结果表明:在注浆加固条件下,已建隧道的位移及内力都有较大程度的降低,但在加固区与未加固区交界附近可产生一定的突变,在现场施工时该段范围应重点监控.

References

[1]  何川,苏宗贤,曾东洋.盾构隧道施工对已建平行隧道变形和附加内力的影响研究[J].岩石力学与工程学报,2007,26(10):2063-2069.HE Chuan,SU Zong-xian,ZENG Dong-yang.Research on influence of shield tunnel construction on deformation and secondary inner force of constructed parallel tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2007,26(10):2063-2069.(in Chinese)
[2]  赵明.小净距盾构隧道施工力学效应现场监测与数值模拟分析[D].北京:北京工业大学建筑工程学院,2012.ZHAO Ming.Mechanics effect analysis on shield tunneling in close proximity by in-situ monitoring and numerical simulation[D].Beijing:College of Architecture and Civil Engineering,Beijing University of Technology,2012.(in Chinese)
[3]  张明聚,赵明,贾大鹏,等.小净距盾构隧道施工管片附加应力监测与分析[J].北京工业大学学报,2013,39(4):536-541.ZHANG Ming-ju,ZHAO Ming,JIA Da-peng,et al.Field test and analysis of segment secondary stresses in small interval shield tunnel during construction[J].Journal of Beijing University of Technology,2013,39(4):536-541.(in Chinese)
[4]  张明聚,赵明,王鹏程,等.小净距平行盾构隧道施工先行隧道管片附加应力监测研究[J].岩土工程学报.2012,34(11):2121-2126.ZHANG Ming-ju,ZHAO Ming,WANG Peng-cheng,et al.Field tests and researches on secondary stresses of advanced tunnel segments during parallel shield tunnels driving in close proximity[J].Chinese Journal of Geotechnical Engineering,2012,34(11):2121-2126.(in Chinese)
[5]  林志,朱合华,夏才初.双线盾构隧道施工过程相互影响的数值研究[J].地下空间与工程学报,2009,5(1):85-89,132.LIN Zhi,ZHU He-hua,XIA Cai-chu.Numerical modeling study on interaction between twin shields tunneling[J].Chinese Journal of Underground Space and Engineering,2009,5(1):85-89,132.(in Chinese)
[6]  王伟,夏才初,朱合华,等.双线盾构越江隧道合理间距优化与分析[J].岩石力学与工程学报,2006,25(增刊1):3311-3316.WANG Wei,XIA Cai-chu,ZHU He-hua,et al.Optimization and analysis of reasonable distance of twintube river-crossing shield tunnel[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(Suppl 1):3311-3316.(in Chinese)
[7]  CHAPMAN D N,AHN S K,HUNT D V L.Investigating ground movements caused by the construction of multiple tunnels in soft ground using laboratory model tests[J].Canadian Geotechnical Journal,2007,44:631-643.
[8]  李宗.软土条件下地铁小净距盾构隧道变形控制技术[J].铁道标准设计,2012(6):112-116.LI Zong.Technology on deformation control of closespaced shield tunnel of metro in soft soil conditions[J].Railway Standard Design,2012(6):112-116.(in Chinese)
[9]  道総合技術研究所.都市部鉄道構造物の近接施工対策マニュアル[M].東京都国分寺市:鉄道総合技術研究所,2007.
[10]  黄宏伟,徐凌,严佳梁,等.盾构隧道横向刚度有效率研究[J].岩土工程学报,2006,28(1):11-18.HUANG Hong-wei,XU Ling,YAN Jia-liang,et al.Study on transverse effective rigidity ratio of shield tunnels[J].Chinese Journal of Geotechnical Engineering,2006,28(1):11-18.(in Chinese)
[11]  钟小春,张金荣,秦建设.盾构隧道纵向等效弯曲刚度的简化计算模型及影响因素分析[J].岩土力学,2011,32(1):132-136.ZHONG Xiao-chun,ZHANG Jin-rong,QIN Jian-she,et al.Simplified calculation model for longitudinal equivalent bending stiffness of shield tunnel and its influence factors'analysis[J].Rock and Soil Mechanics,2011,32(1):132-136.(in Chinese)
[12]  LEE K M,HOU X Y,GE X W,et al.An analytical solution for a jointed shield driven tunnel lining[J].International Journal for Numerical and Analytical Methods in Geomechanics,2001,25(4):365-390.
[13]  LEE K M,GE X W.The equivalence of a jointed shield driven tunnel lining to a continuous ring structure[J].Journal of Canadian Geotechnical Engineering,2001,38:461-483.