王梦恕.21世纪是隧道及地下空间大发展的年代[J].隧道建设,2000(1):7-10.WANG Meng-shu.Twenty-first century is the time of tunnel and underground space development age[J].Tunnel Construction,2000(1):7-10.(in Chinese)
卢清国.长距离隧道自驱动前行的可行性[C]∥第三届中日盾构隧道技术交流会论文集.成都:西南交通大学出版社,2005:6-21.LU Qing-guo.The feasibility of self driving along the long distance tunnel[C]∥The third China Japan Shield Tunneling Technology Exchange Conference.Chengdu:Southwest Jiaotong University Press,2005:6-21.(in Chinese)
[5]
吴光林,严谨.船用螺旋桨理论研究的发展与方向[J].中国船舰研究,2009(4):8-12.WU Guang-lin,YAN Jin.Development and methods on theoretical research of marine propellers[J].Chinese Journal of Ship Research,2009(4):8-12.(in Chinese)
[6]
黄春霞.土力学[M].南京:东南大学出版社,2012:9-50.
[7]
杜安平.螺旋钻杆设计参数的计算方法与实验验证[J].煤炭工程师,1995,5(6):5-20.DU An-ping.With the experimental design and calculation method of parameters of spiral drill pipe verification[J].Coal Engineer,1995,5(6):5-20.
[8]
卢清国,田永超.螺旋类型、长度及外径对旋牵拉结构拉力影响的试验研究[J].低温建筑技术,2013,8(6):1-5.LU Qing-guo,TIAN Yong-chao.Experimental study of spiral type,length and diameter of traction force influence on the spin structure[J].Low Temperature Construction Technology,2013,8(6):1-5.(in Chinese)
[9]
上海市科学技术交流站.正交试验设计法[M].上海:上海人民出版社,1975:3-50.
[10]
杨俊杰.相似理论与结构模型试验[M].武汉:武汉理工大学出版社,2005:21-48.
[11]
鲁宝安,陈友伟.机械基础知识与技术[M].武汉:武汉理工大学出版社,2010:8-90.
[12]
王文隆,王修斌.地面力学中土壤参数的选定及其测量方法和仪器[J].农业机械学报,1983,8(4):1-9.WANG Wen-long,WANG Xiu-bin.The selected parameters of soil mechanics in the ground and its measuring method and instrument[J].Journal of Agricultural Machinery,1983,8(4):1-9.(in Chiense)
[13]
胡均平,徐圆,郭勇,等.螺旋转成层土拔钻力的研究[J].中南林业科技大学学报,2010,7(6):9-42.HU Jun-ping,XU Yuan,GUO Yong,et al.Study on drilling force pulling screw into the layer of soil[J]Journal of Central South University of Forestry&Technology,2010,7(6):9-42.(in Chinese)