宋小林,翟婉明.高速移动荷载作用下CRTSⅡ型板式无砟轨道基础结构动应力分布规律[J].中国铁道科学,2012,33(4):1-6.SONG Xiao-lin,ZHAI Wan-ming.Dynamic stress distribution of the infrastructure of CRTSⅡslab ballastless track under high speed moving load[J].China Railway Science,2012,33(4):1-6.(in Chinese)
[2]
FRITZ K,DIETMAR A.Dynamic effects due to moving loads on tracks for high-speed railways and on tracks for metro lines[C]∥Proceedings of the 16th International Conference on Soil Mechanics and Geotechnical Engineering:Geotechnology in Harmony With the Global Environment.Netherlands:Millpress Science Publishers,2005:1735-1740.
[3]
TAKEMIYA Hirokazu.Simulation of track-ground vibrations due to a high-speed train:the case of X-2000 at ledsgrad[J].Journal of Sound and Vibration,2003,261(3):503-526.
[4]
卿启湘,王永和,赵明华,等.高速移动载荷作用下板式轨道-软岩路基系统的动力特性分析[J].岩土力学,2008,29(5):1396-1402.QING Qi-xiang,WANG Yong-he,ZHAO Ming-hua,et al.Research on dynamic characteristics of slab track-roadbed systems with soft rock as embankment filling under high speed moving load[J].Rock and Soil Mechanics,2008,29(5):1396-1402.(in Chinese)
[5]
詹永祥,蒋关鲁,胡安华,等.遂渝线无碴轨道桩板结构路基动力响应现场试验研究[J].岩土力学,2009,30(3):832-835.ZHAN Yong-xiang,JIANG Guan-lu,HU An-hua,et al.Study of dynamic response of pile-plank embankment of ballastless track based on field test in Suining-Chongqing High-speed Railway[J].Rock and Soil Mechanics,2009,30(3):832-835.(in Chinese)
[6]
詹永祥,蒋关鲁.无碴轨道路基基床动力特性的研究[J].岩土力学,2010,31(2):392-396.ZHAN Yong-xiang,JIANG Guan-lu.Study of dynamic characteristics of soil subgrade bed for ballastless track[J].Rock and Soil Mechanics,2010,31(2):392-396.(in Chinese)
[7]
董亮,赵成刚,蔡德钩,等.高速铁路无砟轨道路基动力特性数值模拟和试验研究[J].土木工程学报,2008,41(10):82-86.DONG Liang,ZHAO Cheng-gang,CAI De-gou,et al.Experimental validation of a numerical model for prediction of the dynamic response of ballastless subgrade of highspeed railways[J].China Civil Engineering Journal,2008,41(10):82-86.(in Chinese)
[8]
邱延峻,方明镜,张晓靖,等.高速铁路无砟轨道路基结构适应性动力分析[J].西南交通大学学报,2011,46(2):183-188.QIU Yan-jun,FANG Ming-jing,ZHANG Xiao-jing,et al.Dynamic analysis of structural adaptivity of ballastless track substructure of high speed railway[J].Journal of Southwest Jiaotong University,2011,46(2):183-188.(in Chinese)
[9]
王启云,张家生,孟飞,等.高速铁路轨道路基模型及动力加载研究[J].铁道学报,2012,34(12):90-95.WANG Qi-yun,ZHANG Jia-sheng,MENG Fei,et al.Study on track-subgrade model of high-speed railway and dynamical loading[J].Journal of the China Railway Society,2012,34(12):90-95.(in Chinese)
[10]
马学宁,梁波,高峰.高速铁路板式无砟轨道-路基结构动力特性研究[J].铁道学报,2011,33(2):72-78.MA Xue-ning,LIANG Bo,GAO Feng.Study on the dynamic properties of slab ballast less track and subgrade structure on high-speed railway[J].Journal of the China Railway Society,2011,33(2):72-78.(in Chinese)
[11]
SONG Xiao-lin,ZHAI Wan-ming.Dynamic stress distribution of high-speed railway non-ballasted track infrastructure[J].Journal of Sichuan University,2011,43(Suppl 2):156-160,164.