LIN Qiang. Probe the foundation of dispute adjudication system in China projects management[J]. Economic Restructuring, 2003(2): 153-156. (in Chinese)
[2]
FIDIC. Conditions of contract for construction[A]. The FIDIC Contracts Guide[M]. Switzerland: FIDIC Bookshop, 2000. 299-317.
[3]
FIDIC.设计-建造与交钥匙工程合同条件[M].北京:中国建筑工业出版社,1996.60-65.
[4]
FIDIC. Conditions of Contract for Design-build and Turnkey Projects[M] . Beijing: China Building Industry Publication, 1996. 60-65. (in Chinese)
[5]
水利部.水利水电工程施工合同和招标文件示范文本[M].北京:中国水利水电出版社,2000.56。The Ministry of Water Resource. Example Forms of the Documents of Invitation to Tenders and Contract for the Water Resource and Hydropower Construction[M]. Beijing: China WaterPower Press, 2000. 56. (in Chinese)
[6]
杨道富.国际水电工程施工中的作用和特性研究[J].建筑经济,2002(2):41-43.YANG Dao-fu. The research of effect and characteristic in international hydropower construction[J]. Construction Economy, 2002(2): 41-43. (in Chinese)
[7]
徐绳墨.关于HDIC合同条件中的争议、索赔和解决途径与程序[J].建筑经济,2002(3):0—21.XU Sheng-mo. Dispute, claim and adjust procedure in FIDIC contracts[J]. Construction Economy, 2002(3): 20-21. (in Chinese)
[8]
林强.我国项目管理建立争议评审制度的探讨[J].经济体制改革,2003(2):153-156.
[9]
邹新华.解决国际工程项目争议的新途径[J].中外公路,2003,23(3):23.
[10]
ZOU Xin-hua. The new channel to resolve dispute in international projects[J]. Chinese-foreign Highway, 2003, 23(3): 23. (in Chinese)