张虎.地表注浆在隧道工程中的应用[J].公路,2006(3):204-209.ZHANG Hu.The application of advanced grouting from ground in tunnel engineering[J].Highway,2006(3):204-209.(in Chinese)
[2]
朱泽兵.渝怀铁路歌乐山隧道洞口滑坡段施工技术[J].地下空间,2002,22(4):303-305.ZHU Ze-bing.Construction technique of landslip section at the entrance of Geleshan tunnel in the railway from Chongqing to Huaihua in south-western China[J].Underground Space,2002,22(4):303-305.(in Chinese)
[3]
邹德松,刘兰利.枣槐岭2号隧道进口段地表加固施工[J].铁道建筑技术.2005(增):115-117.ZOU De-song,LIU Lan-li.Construction of advanced reinforcement from ground at the entrance section of No.2 tunnel in Za- ohuailing[J].Railway Construction Technology,2005(Supplement):115-117.(in Chinese)
[4]
郭衍敬,张明聚,张斌.海底隧道穿越风化深槽施工方案[J].北京工业大学学报,2006,32(6):520-525.GUO Yan-jing,ZFIANG Ming-ju,ZHANG Bin.A construction solution to tunneling through the deep weathered rock trough of sub-sea tunnels[J].Journal of Beijing University of Technology,2006,32(6):520-525.(in Chinese)
[5]
关宝树.隧道工程施工要点集[M].北京:人民交通出版社,2003.
[6]
关宝树.隧道工程设计要点集[M].北京:人民交通出版社,2003.
[7]
王国欣,谢雄耀,黄宏伟.公路隧道洞口滑坡的机制分析及监控预报[J].岩石力学与工程学报,2006,25(2):268- 274.WANG Guo-xin,XIE Xiong-yao,HUANG Hong-wei.Mechanism analysis and monitoring forecast of landslide at road tun- nel face[J].Chinese Journal of Rock Mechanics and Engineering,2006,25(2):268-274.(in Chinese)
[8]
熊四华,范草原.山岭公路隧道进洞施工方案浅析[J].重庆交通学院学报,2003,22(4):14-16.??XIONG Si-hua,FAN Cao-yuan.Excavating tunnel construction plan analysis for mountain ridge highway tunnel[J].Journal of Chongqing Jiaotong University,2003,24(4):14-16.(in Chinese)
[9]
王梦恕.地下工程浅埋暗挖技术通论[M].合肥:安徽教育出版社,2004.
[10]
马海君.郝行舟.浅谈地表注浆加固在不良地质隧道中的应用[J].交通科技,2005(6):67-69.MA Hai-jun,HAP Xing-zhou.An introduction to application of advanced grouting from ground in tunnels of bad geological conditions[J].Transportation Science and Technology,2005(6):67-69.(in Chinese)