王元湘.盖挖逆作法在我国地铁工程中的应用[J].土木工程学报,1996,29(1):3-14.WANG Yuan-xiang.Application of cover-and-cut reverse construction method to metro engineering in China[J].Joumel of Civil Engineering,1996,29(1):3-14.(in Chinese)
[4]
秦海燕,刘云亮.深圳地铁科学馆车站的设计与施工技术[J].施工技术,2006,35(7):84-86.QIN Hai-yan,LIU Yun-liang.Design and Construction Technology of Shenzhen Metro Kexueguan Station[J].Construction Technology,2006,35(7):84-86.(in Chinese)
[5]
李永红.广州地铁市二宫车站盖挖逆作法施工技术[J].广州建筑,2001,(4):10-13.LI Yong-hong.Construction technique of cover-and-cut reverse method for a subway station in Guangzhou[J].Guangzhou Architecture,2001,(4):10-13.(in Chinese)
[6]
张明聚,由海亮,杜修力,等.北京地铁某车站明挖基坑施工监测与分析[J].北京工业大学学报,2006,32(10):874- 878.ZHANG Ming-ju,YOU Hai-liang,DU Xiu-li,et al.Construction monitoring analysis for an open excavated foundation-pit of a subway station in Beijing[J].Journal of Beijing University of Technology,2006,32(10):874-878.(in Chinese)
[7]
谢世华.地铁天安门东站采用盖挖逆筑法施工[J].铁道建筑,1997,(3):12-16.XIE Shi-hua.Construction of Tian'anmen East station engineering of Beijing subway by cover-and-cut reverse method[J].Railway Engineering,1997,(3):12-16.(in Chinese)
[8]
胡瑞逢.地铁天安门东站盖挖逆作法施工简介[J].隧道建设,1997,(4):7-16.HU Rui-feng.A brief review of construction of Tian'anmen East station engineering of Beijing subway by cover-and-cut re- verse method[J].Tunnel Construction,1997,(4):7-16.(in Chinese)