CEDER A.Public transit planning and operation theory,modelling and practice[M].Chernai,India:Elsevier,Charon Tec Ltd(A Macmillan Company),2007:361-380.
[2]
VIJAYARAGHAVAN T A S.Vehicle scheduling in urbantransportation with quick and cut trip insertions for fleetreduction[J].Transportation Planning and Technology,1988,12(2):105-120.
[3]
VIJAYARAGHAVAN T A S,ANANTHARAMAIAH K M.Fleet assignment strategies in urban transportation usingexpress and partial services[J].Transportation ResearchPart A,1995,29(2):157-171.
[4]
CEDER A.Designing transit short-turn trips with theelimination of imbalanced load[C]∥Proceedings of theFourth International Workshop on Computer-AidedScheduling of Public Transport.Hamburg,Germany:[s.n.],1987:28-31.
[5]
FURTH P G.Short turning on transit routes[J].Transportation Research Record,1988,1108:45-52.
[6]
EBERLEIN X J.Real-time control strategies in transitoperations:models and analysis[D].Massachusetts,USA:Civil Engineering,MIT,1995.
[7]
杨兆升.城市智能公共交通系统理论与方法[M].北京:中国铁道出版社,2004.
[8]
徐大伟,裴玉龙.公共交通大站快车调度模型[J].哈尔滨工业大学学报,2008,40(4):580-584.XU Da-wei,PEI Yu-long.Express bus scheduling modeland application[J].Journal of Harbin Institute ofTechnology,2008,40(4):580-584.(in Chinese)
[9]
陈明明.城市公交车辆组合调度问题的研究[D].兰州:兰州交通大学交通运输学院,2007.CHEN Ming-ming.Study on the problem of combinationalvehicle scheduling for public transit[D].Lanzhou:School of Traffic and Transportation,Lanzhou JiaotongUniversity,2007.(in Chinese)
[10]
孙传娇,周伟,王元庆.快速公交车辆调度组合及发车间隔优化研究[J].交通运输系统工程与信息,2008,8(5):61-67.SUN Chuan-jiao,ZHOU Wei,WANG Yuan-qing.Scheduling combination and headway optimization of busrapid transit[J].Journal of Transportation SystemsEngineering and Information Technology,2008,8(5):61-67.(in Chinese)
[11]
OLDFIELD R H,BLY P H.An analytic investigation ofoptimal bus size[J].Transportation Research Part B,1988,22(5):319-337.