Costa S, Brandão A F. Optimization of the maintenance of oil filled power transformers based on reliability criteria[C]∥IEEE/PES Transmission and Distribution Conference and Exposition. Latin America, USA: IEEE, 2004: 297-301.
[2]
周 湶,孙 超,廖瑞金,等. 基于云理论的变压器多重故障诊断及短期预测方法[J]. 高电压技术,2014,40(5):1453-1460. ZHOU Quan, SUN Chao, LIAO Ruijin, et al . Multiple fault diagnosis and short-term forecast of transformer based on cloud theory[J]. High Voltage Engineering, 2014, 40(5): 1453-1460.
[3]
Weekes T, Molinski T, Li X, et al . Risk assessment using transformer loss of life data[J]. IEEE Electrical Insulation Magazine, 2004, 20(2): 27-31.
[4]
廖瑞金,孟繁津,周年荣,等. 基于集对分析和证据理论融合的变压器内绝缘状态评估方法[J]. 高电压技术,2014,40(2):474-481. LIAO Ruijin, MENG Fanjin, ZHOU Nianrong, et al . Assessment strategy for inner insulation condition of power transformer based on set-pair analysis and evidential reasoning decision-making[J]. High Voltage Engineering, 2014, 40(2): 474-481.
[5]
Moubray J. 以可靠性为中心的维修[M]. 北京:机械工业出版社,1995:123-125. Moubray J. Reliability-centered maintenance[M]. Beijing,China: China Machine Press, 1995: 123-125.
[6]
Guimaraes A, Lapa C. Effects analysis fuzzy inference system in nuclear problems using approximate reasoning[J]. Annals of Nuclear Energy, 2004, 31(1): 107-115.
[7]
Pillay A, Wang J. Modified failure mode and effects analysis using approximate reasoning[J]. Reliability Engineering and System Safety, 2003, 79(1): 69-85.
[8]
王有元,周婧婧,陈伟根,等. 基于模糊决策的电力变压器风险评估方法[J]. 仪器仪表学报,2009,30(8):1662-1667. WANG Youyuan, ZHOU Jingjing, CHEN Weigen, et al . Risk assessment method of power transformer based on fuzzy decision making[J]. Chinese Journal of Scientific Instrument, 2009, 30(8): 1662-1667.
[9]
李德毅,杜 鹢. 不确定性人工智能[M]. 北京:国防工业出版社,2005:144-150. LI Deyi,DU Yi. Uncertainty artificial intelligence[M]. Beijing, China: National Defence Industry Press, 2005: 144-150.
[10]
刘常昱,李德毅,杜 鹢,等. 正态云模型的统计分析[J]. 信息与控制,2005,34(2):236-239. LIU Changyu, LI Deyi, DU yi, et al . Some statistical analysis of the normal cloud model[J].Information and Control, 2005, 34(2): 236-239.
[11]
李德毅,刘常昱. 论正态云模型的普适性[J]. 中国工程科学,2004,6(8):28-34. LI Deyi, LIU Changyu. Study on the universality of the normal cloud model[J]. Engineering Science, 2004, 6(8): 28-34.
[12]
于丰喜,程 力. 基于云模型的炮兵旅(团)装备保障体系效能评估[J]. 科学技术与工程,2007,7(2):252-254. YU Fengxi, CHENG Li. Effectiveness evaluation of artillery brigade or regimen equipment support based on cloud model[J]. Science Technology and Engineering, 2007, 7(2): 252-254.
[13]
胡石元,李德仁,刘耀林,等. 基于云模型和关联度分析法的土地评价因素权重挖掘[J]. 武汉大学:信息科学版,2006,31(5):423-427. HU Shiyuan, LI Deren, LIU Yaolin, et al . Weight mining of land evaluation factors based on cloud model and correlation analysis[J]. Geomatics and Information Science of Wuhan University, 2006, 31(5): 423-427.
[14]
Li D R, Di K C, Li D Y. Knowledge representation and uncertaintiy reasoning in GIS based on cloud models[C]∥9 th International Symposium on Spatial Data Handling. Beijing, China: [s.n.], 2000: 10-12.
[15]
Jiao P, Zha Y B.Credibility evaluation method based on cloud model[C]∥International Conference on Electrical and Control Engineering. Wuhan, China: IEEE, 2010: 648-651.
[16]
张镱议,廖瑞金,杨丽君,等. 基于云理论的电力变压器绝缘状态评估方法[J]. 电工技术学报,2012,27(5):13-19. ZHANG Yiyi, LIAO Ruijin, YANG Lijun, et al . An assessment method for insulation condition of power transformer based upon cloud model[J]. Transactions of China Electrotechnical Society, 2012, 27(5): 13-19.
[17]
王有元. 基于可靠性和风险评估的电力变压器状态维修决策方法研究[D]. 重庆:重庆大学,2008:79-81. WANG Youyuan. Study on condition maintenance decision making method of power transformer based on reliability and risk evaluation[D]. Chongqing, China: Chongqing University, 2008: 79-81.