崔 翔,陈维江,胡 榕,等. 用于测量气体绝缘开关设备瞬态外壳电压的系统:中国,CN102121948A[P]. 2011-07-13. CUI Xiang, CHEN Weijiang, HU Rong, et al . Measurement system for transient overvoltage of gas-insulated switchgear: China, CN102121948A[P]. 2011-07-13.
[2]
Anderson P M, Farmer R G. Series compensation of power systems[M]. California, USA: Fred Laughter and PBLSH Incorporated, 1996: 1-18.
[3]
Grunbaum R, Samuelsson J. Series capacitors facilitate long distance AC power transmission[C]∥International Conference on Power System Technology. SanktPeterburg, Russia: IEEE, 2005: 1-6.
[4]
Kirschner L, Lima M C, Fernandes J E C, et al . Benefits and design aspects of Sao Joao do Piaui 500 kV series capacitors[C]∥Proceedings of Transmission and Distribution Conference and Exposition. Sao Paulo, Brazil: IEEE, 2004: 17-21.
[5]
高 飞,陈维江,刘之方,等. 1 000 kV交流输电系统串补站的雷电侵入波保护[J]. 高电压技术,2010,36(9):2199-2205. GAO Fei, CHEN Weijiang, LIU Zhifang, et al . Protection of series compensation station against lightenning intruded wave in 1 000 kV AC transmission system[J]. High Voltage Engineering, 2010, 36(9): 2199-2205.
[6]
张媛媛,班连庚,项祖涛,等. 1 000 kV特高压固定串联补偿装置关键元件工作条件研究[J]. 电网技术,2013,37(8):2218-2224. ZHANG Yuanyuan, BAN Liangeng, XIANG Zutao, et al . Research on working condition of key components for fixed series compensation in 1 000 kV UHVAC power transmission project[J]. Power System Technology, 2013, 37(8): 2218-2224.
[7]
马其燕,崔 翔,张卫东,等. 特高压串补装置平台的开关操作瞬态电磁特性仿真研究[J]. 中国电机工程学报,2012,33(13):200-211. MA Qiyan, CUI Xiang, ZHANG Weidong, et al . Simulation of electromagnetic transient characteristics on platform of 1 000 kV fixed series capacitors due to switching operation[J]. Proceedings of the CSEE, 2012, 33(13): 200-211.
[8]
IEEE Std C37.116—2007 IEEE guide for protective relay application to transmission-line series capacitor banks[S]. New York, USA: IEEE Power Engineering Society, 2007.
[9]
岳功昌,刘卫东,陈维江,等. 特高压气体绝缘组合开关设备中特快速瞬态过电压测量系统的标定[J]. 高电压技术,2012,38(2):372-349. YUE Gongchang, LIU Weidong, CHEN Weijiang, et al . Calibration of very fast transient overvoltage measurement system for ultra high voltage gas insulated switchgear[J]. High Voltage Engineering, 2012, 38(2): 372-349.
[10]
李志兵,陈维江,王 浩,等.特高压交流试验示范工程GIS隔离开关带电操作试验[J].高电压技术,2012,38(6):1436-1444. LI Zhibing, CHEN Weijiang, WANG Hao, et al . Switching tests of energized GIS disconnectors in UHV AC pilot demonstration project[J]. High Voltage Engineering, 2012, 38(6): 1436-1444.
[11]
崔 翔,胡 榕,陈维江,等. GIS二次系统骚扰电压和骚扰电流的测量系统与方法:中国,CN102608401A[P]. 2012-07-25. CUI Xiang, HU Rong, CHEN Weijiang, et al . Measurement method and system for secondary system disturbance due to operation of gas-insulated switchgear: China,CN102608401A[P]. 2012-07-25.
[12]
Paul C R. Introduction to electromagnetic compatibility[M]. Second edition. New Jersey, USA: John Wiley & Sons, 2005: 299-369.
[13]
Henry W O. Electromagnetic compatibility engineering[M]. New Jersey, USA: John Wiley & Sons, 2009: 106-155.
[14]
李景禄. 电力系统电磁兼容技术[M]. 北京:中国电力出版社,2007:168-181. LI Jinglu. The electromagnetic compatibility of power system[M]. Beijing, China: China Electric Power Press, 2007: 168-181.
[15]
梁振光. 电磁兼容原理、技术及应用[M]. 北京:机械工业出版社,2007:59-68. LIANG Zhenguang. Theory of electromagnetic compatibility[M]. Beijing, China: China Machine Press, 2007: 59-68.
[16]
IEEE Std 299™—2006 IEEE standard method for measuring the effectiveness of electromagnetic shielding enclosures[S], 2006.
[17]
GB/T 17626.1—2006 电磁兼容试验和测量技术—抗扰度试验总论[S]. 北京:中国标准出版社,2006. GB/T 17626.1—2006 Electromagnetic compatibility testing and measurement techniques—overview of immunity tests[S]. Beijing, China: China Standards Press, 2006.
Wiggins C M, Thomas D E, Nickel F S, et al . Transient electromagnetic interference in substations[J]. IEEE Transations on Power Delivery, 1994, 9(4): 1869-1884.
[26]
Ma Q Y, Cui X, Hu R, et al . Experimental study on secondary system grounding of UHV fixed series capacitors via EMI measurement on an experimental platform[J]. IEEE Transactions on Power Delivery, 2012, 27(4): 2374-2381.