周沛洪,戴 敏,何慧雯. ±800 kV特高压直流输电系统换流变阀侧绕组过电压与绝缘配合[J]. 高电压技术,2012,38(12):3146-3155. ZHOU Peihong, DAI Ming, HE Huiwen. Overvoltage and insulation coordination for valve winding of ±800 kV UHVDC converter transformer[J]. High Voltage Engineering, 2012, 38(12): 3146-3155.
[2]
杨一鸣,张 蕾. ±800 kV特高压直流输电工程换流站主设备规范[J]. 高电压技术,2012,38(12):3235-3239. YANG Yiming, ZHANG Lei. Specification of main equipment in converter stations for ±800 kV UHVDC projects[J]. High Voltage Engineering, 2012, 38(12): 3235-3239.
[3]
余思远,谢 超,郝志杰. 云广±800 kV直流工程换流变压器阀侧套管出线装置的安装经验[J]. 南方电网技术,2010,4(4):77-78. YU Siyuan, XIE Chao, HAO Zhijie. Installation experience of converter transformer’s winding connection valve side in Yunnan-Guangdong ±800 kV DC project[J]. Southern Power System Technology, 2010, 4(4): 77-78.
[4]
李文平,章忠国,黎小林,等. 直流输电用800kV换流变压器的场域分析[J]. 变压器,2009,46(6):1-5. LI Wenping, ZHANG Zhongguo, LI Xiaolin, et al . Field analysis of 800 kV converter transformer for DC transmission[J]. Transformer, 2009, 46(6): 1-5.
[5]
傅铁军,王 健,吕金壮,等. 直流输电±800 kV换流变压器的绝缘结构分析[J]. 变压器,2009,46(3):1-5. FU Tiejun, WANG Jian, LÜ Jinzhuang, et al . Insulation structure analysis of ±800 kV converter transformer for DC transmission[J]. Transformer, 2009, 46(3): 1-5.
[6]
孙优良,汪清濮,李文平,等. ±800 kV换流变压器的设计工艺技术研究[J]. 变压器,2007,44(5):22-28. SUN Youliang, WANG Qingpu, LI Wenping, et al . Research on design and technology of ±800kV converter transformer[J]. Transformer, 2007, 44(5): 22-28.
[7]
赵林杰,黎小林,吕金壮,等. 面向±800 kV直流主设备监造的关键试验技术研究及工程应用[R]. 广州:南方电网科学研究院有限责任公司,2011. ZHAO Linjie, LI Xiaolin, LÜ Jinzhuang, et al . Key experimental technology of ±800 kV HVDC main equipment and its application to supervision[R]. Guangzhou, China: Electric Power Research Institute, China Southern Power Grid, 2011.
[8]
Ynny Fu, Peter Vaessen, Wilco Rorijs, 等. 特高压直流换流变压器试验标准和要求的探讨[J]. 南方电网技术,2009,3(3):1-6. Yanny Fu, Peter Vaessen, Wilco Rorijs, et al . Discussion on the test requirements and standards for UHVDC converter transformers[J]. Southern Power System Technology, 2009, 3(3): 1-6.
[9]
夏谷林,黄和燕,陈 禾. ±800 kV换流变压器阀侧交流耐压试验局部放电超标分析[J]. 南方电网技术,2011,5(4):29-31. XIA Gulin, HUANG Heyan, CHEN He. Analysis on the excessive discharge partially at valve side of ±800 kV converter transformer during the AC withstand voltage test[J]. Southern Power System Technology, 2011, 5(4): 29-31.
[10]
赵林杰,黎小林,孙夏青,等. 换流变压器的交直流绝缘特性及电场测量与运行安全评估技术研究[R]. 广州:南方电网科学研究院有限责任公司,2013. ZHAO Linjie, LI Xiaolin, SUN Xiaqing, et al . Research on AC-DC insulation properties and the technology of electric field measurement and operation safety evaluation of converter transformers[R]. Guangzhou, China: Electric Power Research Institute, China Southern Power Grid, 2013.
[11]
赵林杰,黎小林,饶 宏,等. 云广±800 kV直流输电工程换流变压器油中产气现象分析[J]. 南方电网技术,2010,4(5):32-35. ZHAO Linjie, LI Xiaolin, RAO Hong, et al . Analysis on the gas-producing phenomena in converter transformer’s oil of Yunnan-Guandong ±800 kV DC transmission project [J]. Southern Power System Technology , 2010, 4(5): 32-35.
[12]
聂德鑫,沙彦超,周远翔,等. 直流局部放电检测系统研制与应用[J]. 高电压技术,2013,39(8):1981-1987. NIE Dexin, SHA Yanchao, ZHOU Yuanxiang, et al . Development and application of DC partial discharge test system[J]. High Voltage Engineering, 2013, 39(8): 1981-1987.
[13]
聂德鑫,邓建钢,张连星,等. UHVDC换流变压器油纸绝缘缺陷直流局部放电发展过程[J]. 高电压技术,2012,38(12):3249-3260. NIE Dexin, DENG Jiangang, ZHANG Lianxing, et al . Developing processes of direct current partial discharge of defects on ultra high voltage converter transformer oil-paper insulation[J]. High Voltage Engineering, 2012, 38(12): 3249-3260.
[14]
吴云飞,汪 涛,沈 煜,等. 特高压换流变压器现场局部放电试验技术[J]. 高电压技术,2011,37(9):2140-2148. WU Yunfei, WANG Tao, SHEN Yu, et al . On-site partial discharge test technology of ultra high voltage converter transformer[J]. High Voltage Engineering, 2011, 37(9): 2140-2148.
[15]
李 信.GIS局部放电特高频检测技术的研究[D].北京:华北电力大学,2005:7-62. LI Xin. Research of UHF detection for partial discharge in GIS[D]. Beijing, China: North China Electric Power University, 2005: 7-62.
[16]
唐志国. 电力变压器局部放电特高频定位方法的研究[D]. 北京:华北电力大学,2006:9-70. TANG Zhiguo. Partial discharge location in power transformer based on UHF method[D]. Beijing, China: North China Electric Power University, 2006: 9-70.
[17]
齐 波. GIS中典型局部放电发展过程和特征的研究[D]. 北京:华北电力大学,2011:31-140. QI Bo. The evolution process and features of typical partial discharges in GIS[D]. Beijing,China: North China Electric Power University, 2011: 31-140.
[18]
郑书生,陈金祥,李成榕,等. 变压器绕组对局部放电特高频定位方法的影响[J]. 高电压技术,2013,39(2):324-329. ZHENG Shusheng, CHEN Jinxiang, LI Chengrong, et al . Influence of windings on locating partial discharge in transformers by using ultra high frequency method[J]. High Voltage Engineering, 2013, 39(2): 324-329.
[19]
侯慧娟,盛戈皞,苗培青,等. 基于超高频电磁波的变电站局部放电空间定位[J]. 高电压技术,2012,38(6):1334-1340. HOU Huijuan, SHENG Gehao, MIAO Peiqing, et al . Partial discharge location based on radio frequency antenna array in substation[J]. High Voltage Engineering, 2012, 38(6): 1334-1340.
[20]
姚陈果,周电波,陈 攀,等. 采用超高频法监测变电站设备局放水平及其早期预警[J]. 高电压技术,2011,37(7):1670-1676. YAO Chenguo, ZHOU Dianbo, CHEN Pan, et al . UHF-based monitoring for equipment PD within the substation and early warning[J]. High Voltage Engineering, 2011, 37(7): 1670-1676.
[21]
王 颂,赵晓辉,李彦明,等. 变压器局部放电超高频信号的外部检测[J]. 高电压技术,2007,33(8):88-91. WANG Song, ZHAO Xiaohui, LI Yanming, et al . UHF signal external detection of partial discharge in transformers[J]. High Voltage Engineering, 2007, 33(8): 88-91.
[22]
丁登伟,高文胜,刘卫东. 采用特高频法的GIS典型缺陷特性分析[J]. 高电压技术,2011,37(3):706-710. DING Dengwei, GAO Wensheng, LIU Weidong. Analysis on the typical partial discharge using UHF detection method for GIS[J]. High Voltage Engineering, 2011, 37(3): 706-710.
[23]
饶 宏. 云南—广东±800 kV特高压直流输电工程系统设计和研究[J]. 高电压技术,2012,38(12):3113-3118. RAO Hong. System design and research of Yunnan -Guangdong ±800 kV UHVDC project[J]. High Voltage Engineering, 2012, 38(12): 3113-3118.
[24]
吕金壮. 云南—广东±800 kV直流输电工程换流变压器设备规范[R]. 广州:南方电网技术研究中心,2007. LÜ Jinzhuang. Converter transformers specification for Yunnan- Guangdong ±800 kV DC transmission project[R]. Guangzhou, China: Power System Technology Research Center, China Southern Power Grid, 2007.
[25]
赵宇明. 糯扎渡电站送电广东±800 kV直流输电工程换流变压器设备规范[R]. 广州:南方电网科学研究院有限责任公司,2010. ZHAO Yuming. Converter transformers specification for Nuozhadu-Guangdong ±800 kV DC transmission project [R]. Guangzhou, China: Electric Power Research Institute, China Southern Power Grid, 2010.