湖南省电力公司. 湖南省电网“十三五”主网架规划研究报告[R]. 长沙:湖南省电力公司,2014:166-170. Hunan Electric Power Company. The main network planning research report of Hunan power grid in the 13th five year[R]. Changsha, China: Hunan Electric Power Company, 2014: 166-170.
[2]
杜至刚,牛 林,赵建国. 发展特高压交流输电,建设坚强的国家电网[J]. 电力自动化设备,2007,27(5):1-5. DU Zhigang, NIU Lin, ZHAO Jianguo. Developing UHV AC transmission and constructing strong state power grid[J]. Electric Power Automation Equipment, 2007, 27(5): 1-5.
[3]
黄娟娟,郑英芬. 特高压网架对华中电网短路电流水平的影响分析及限流措施[J]. 中国电力,2007,40(3):49-52. HUANG Juanjuan, ZHENG Yingfen. Analysis of effect of 1 000 kV UHV grid on the short circuit current of the Central China Grid and research on limiting measures of short circuit current[J]. Electric Power, 2007, 40(3): 49-52.
[4]
赵 良,郭 强,覃 琴,等. 特高压同步电网稳定性分析[J]. 中国电机工程学报,2008,28(34):47-51. ZHAO Liang, GUO Qiang, QIN Qin, et al . Analysis on stability characteristics of UHV synchronized power grid[J]. Proceedings of the CSEE, 2008, 28 (34): 47-51.
[5]
Abe Y, Yamada Y, KurodaY, et al . Development of short-circuit capacity limiting device(CLD)[J]. Report of the Kansai Electric Research Laboratory, 1986(37): 43-50.
[6]
Sugmimoto S, Kida J, Arita H, et al . Fault current limiting system for 500 kV power systems[J]. Electrical Engineering in Japan, 1999, 127(1): 1403-1410.
[7]
Choi S S, Wang T X, Mahinda V D. A series compensator with fault current limiting function[J]. IEEE Transactions on Power Delivery, 2005, 7(3): 2248-2256.
[8]
韩 戈,韩 柳,吴 琳. 各种限制电网短路电流措施的应用与发展[J]. 电力系统保护与控制,2010,38(1):141-144. HAN Ge, HAN Liu, WU Lin. Application and development of methods on limiting power grid's short-circuit current[J]. Power System Protection and Control, 2010, 38(1): 141-144.
[9]
庄侃沁,陶荣明,尹 凡. 采用串联电抗器限制500 kV短路电流在华东电网的应用[J]. 华东电力,2009,37(21):440-443. ZHUANG Kanqin, TAO Rongming, YIN Fan. Using series reactors to limit 500 kV short-circuit current for East China power grid[J]. East China Electric Power, 2009, 37(21): 440-443.
[10]
蒋跃强,鲍 伟,吴建坤. 超高压电网故障电流限制器在电网中的应用评价[J]. 华东电力,2011,39(1):49-51. JIANG Yueqiang, BAO Wei, WU Jiankun. Application evaluation on the EHV fault current limiter in power grid[J]. East China Electric Power, 2011, 39(1): 49-51.
[11]
陈丽莉,黄民翔,许 诺,等. 考虑潮流约束的限流措施优化配置[J]. 高电压技术,2010,36(6):1572-1576. CHEN Lili, HUANG Minxiang, XU Nuo, et al . Optimal strategy for short-circuit current limiters deployment considering power flow constraints[J]. High Voltage Engineering, 2010, 36(6): 1572-1576.
[12]
王华晞,习贺勋,汤广福,等. 面向超高压电网的故障限流器的应用研究[J]. 高电压技术,2007,33(5):99-102. WANG Huaxin, XI Hexun, TANG Guangfu, et al . Application research of fault current limiter on the EHV grid[J]. High Voltage Engineering, 2007, 33(5): 99-102.
[13]
李 力,李爱民,吴科成,等. 广东电网短路电流超标问题分析和限流措施研究[J]. 南方电网技术,2009,3(增刊):20-24. LI Li, LI Aimin, WU Kecheng, et al . Analysis of short-circuit current exceeding standard of Guangdong power grid and research on limitation measures[J]. Southern Power System Technology, 2009, 3(Supplement): 20-24.
[14]
李 勇,姚文峰,杨 柳,等. 南方电网主网架热稳定和短路电流超标问题分析[J]. 南方电网技术,2013,7(2):21-25. LI Yong, YAO Wenfeng, YANG Liu, et al . Analysis on the problems of thermal stability and standard-exceed short circuit in the CSG main grid[J]. Southern Power System Technology, 2013, 7(2): 21-25.
[15]
官 澜,李光范,李 博,等. 我国特高压电力变压器研究技术及发展[J]. 变压器,2014,51(8):28-33. GUAN Lan, LI Guangfan, LI Bo, et al . Manufacture technology and development of UHV power transformer in China[J]. Transformer, 2014, 51(8): 28-33.
[16]
孙奇珍,蔡泽祥,李爱民,等. 500 kV电网短路电流超标机理及限制措施适应性[J]. 电力系统自动化,2009,33(21):92-96. SUN Qizhen, CAI Zexiang, LI Aimin, et al . A short-circuit current over-limited mechanism of 500 kV power system and the adaptability of limiting measures[J]. Automation of Electric Power Systems, 2009, 33(21): 92-96.
[17]
杨 冬,刘玉田,牛新生. 电网结构对短路电流水平及受电能力的影响分析[J]. 电力系统保护与控制,2009,37(22):62-67. YANG Dong, LIU Yutian, NIU Xinsheng. Analysis on influence of power grid structure upon short circuit level and power receiving capability[J]. Power System Protection and Control, 2009, 37(22): 62-67.