Thue W A. Electrical power cable engineering[M]. 3 rd ed. Florida, USA: The Chemical Rubber Company Press, 2011: 1-12.
[2]
周远翔,赵健康,刘 睿,等. 高压/超高压电力电缆关键技术分析及展望[J]. 高电压技术,2014,40(9):2593-2612. ZHOU Yuanxiang, ZHAO Jiankang, LIU Rui, et al . Key technical analysis and prospect of high voltage and extra-high voltage power cable[J]. High Voltage Engineering, 2014, 40(9):2593-2612.
[3]
李莉华,高 凯. 日本东京500 kV地下变电站及电缆的设计和建设[J]. 国际电力,2005,9(6):38-41. LI Lihua, GAO Kai. Design and construction of the 500 kV underground substation and cable in Tokyo, Japan[J]. International Electric Power for China, 2005, 9(6): 38-41.
[4]
朱晓辉,杜伯学,周风争,等. 高压交联聚乙烯电缆在线监测及检测技术的研究现状[J]. 绝缘材料,2009,42(5):58-63. ZHU Xiaohui, DU Boxue, ZHOU Fengzheng, et al . Progress of on-line monitoring and detecting technique for high voltage XLPE cable[J]. Insulating Materials, 2009, 42(5): 58-63.
[5]
靖小平,彭小圣,姜 伟,等. 基于K-means聚类算法的自动图谱识别在电缆局放在线监测系统中的应用[J]. 高电压技术,2012,38(9):100-102. JING Xiaoping, PENG Xiaosheng, JIANG Wei, et al . Phase resolved partial discharge pattern recognition method for on-line cable condition monitoring system based on K-means clustering[J]. High Voltage Engineering, 2012, 38(9): 100-102.
[6]
韦 斌,王 伟,李成榕,等. VHF钳型传感器在线检测110 kV XLPE电缆局放[J]. 高电压技术,2004,30(7):37-39. WEI Bin, WANG Wei, LI Chengrong, et al . Partial discharges on-line detection of 110 kV XLPE cables using VHF clamp current transducer[J]. High Voltage Engineering, 2004, 30(7): 37-39.
[7]
徐 阳,钟力生,曹晓珑. XLPE电缆及接头局放的超高频测量与分析[J]. 电工电能新技术,2002,21(1):5-8. XU Yang, ZHONG Lisheng, CAO Xiaolong. UHF partial discharge detection in cable and cable accessories[J].Advanced Technology of Electrical Engineering and Energy, 2002, 21(1): 5-8.
[8]
罗俊华,冯 江,袁 检,等. 交联聚乙烯电缆局放高频检测技术的研究[J]. 电网技术,2001,25(12):42-45. LUO Junhua, FENG Jiang, YUAN Jian, et al . Study on detection of partial discharge in XLPE cable at higher frequency[J]. Power System Technology, 2001, 25(12): 42-45.
[9]
陈向荣,徐 阳,王 猛,等. 高温下110 kV交联聚乙烯电缆电树枝生长及局放特性[J]. 高电压技术,2012,38(3):645-654. CHEN Xiangrong, XU Yang, WANG Meng, et al . Propagation and partial discharge characteristics of electrical trees in 110 kV XLPE cable insulation at high temperature[J]. High Voltage Engineering, 2012, 38(3): 645-654.
[10]
杨孝华. 交联聚乙烯电力电缆局放模式识别的研究[D]. 重庆:重庆大学,2002. YANG Xiaohua. Study on mode recognition of partial discharge in XLPE cable[D]. Chongqing, China: Chongqing University, 2002.
[11]
孙 静. 高压电力电缆局放检测技术研究[D]. 上海:上海交通大学,2012. SUN Jing. Study on partial discharge of high voltage power cable[D]. Shanghai, China: Shanghai Jiao Tong University, 2012.
刘荣生,屠德民,刘子玉. 利用电声脉冲方法测量固体介质中空间电荷的原理[J]. 电工技术学报,1990,5(1):13-20. LIU Rongsheng, TU Demin, LIU Ziyu. Principle of measurement of space charge in solid dielectrics using electro-acoustic pulse method[J]. Transactions of China Electrotechnical Society, 1990, 5(1): 13-20.
[14]
王宁华,高 斌,周远翔,等. 一个实用电声脉冲法空间电荷测量系统[J]. 电测与仪表,2004,41(11):159-162. WANG Ninghua, GAO Bin, ZHOU Yuanxiang, et al . A practical spacecharge testing system realized by the pulse electro-acoustic method[J]. Electrical Measurement &Instrumentation, 2004, 41(11): 159-162.
[15]
常文治. 电力电缆中间接头典型缺陷局放发展过程的研究[D]. 北京:华北电力大学,2013. CHANG Wenzhi. Study on development of typical partial discharges in power cable joint[D]. Beijing, China: North China Electric Power University,2013.
[16]
Ishibashi A, Kawai T, Nakagawa S, et al . A study of treeing phenomena in the development of insulation for 500 kV XLPE cable[J]. IEEE Transactions on Dielectrics and Electrical Insulation, 1998, 5(5): 695-706.
[17]
白 媛. 交联聚乙烯电缆局部放电检测软件系统设计与实现[D]. 上海:上海交通大学,2010. BAI Yuan. Design and realization of partial discharge on-line monitoring software system for XLPE cable[D]. Shanghai, China: Shanghai Jiao Tong University, 2010.
[18]
姚 翔,李海生,付尚莹. 局部放电脉冲在XLPE电缆交叉互联系统中传播特性探讨[J]. 华北电力技术,2008(2):14-17. YAO Xiang, LI Haisheng, FU Shangying. Discuss on transportation characteristics of PD pulse in cross-linking XLPE cable system[J]. North China Electric Power, 2008(2): 14-17.
[19]
唐 忠,廖代发,陈永炜. 基于馈路终端单元的XLPE电缆局部放电在线检测研究[J]. 上海电力学院学报,2008,24(4):365-368. TANG Zhong, LIAO Daifa, CHEN Yongwei. Online XLPE cable partial discharge monitoring and diagnostic system based on feedback terminal unit[J]. Journal of Shanghai University of Electric Power, 2008, 24(4): 365-368.
[20]
陈海波 500 kV世博输变电工程启动调试方案研究[J]. 华东电力,2010,38(4):475-479. CHEN Haibo. Study on startup and commissioning scheme of 500 kV world expo transmission and transformation project[J]. East China Electric Power, 2010, 38(4): 475-479.
[21]
肖传强,周忠义,戴洪宾. 电力电缆网实现状态检修的方法与实践[J]. 高电压技术,2008,34(增刊):152-155. XIAO Chuanqiang, ZHOU Zhongyi, DAI Hongbin. Method and practice of condition-based maintenance applied on power cable network[J]. High Voltage Engineering, 2008, 34(Supplement): 152-155.
[22]
戴洪宾. 电缆局放现场测量信号分析[J]. 广东电缆技术, 2010(1):25-29. DAI Hongbin. Analysis of power cable on-site PD signal[J]. Guangdong Cable Technology, 2010(1): 25-29.
[23]
杨 波,储 强,肖传强. 高压电缆竣工验收试验的同时增加分布式局放测量的分析[J]. 高电压技术,2011,37(增刊):94-97. YANG Bo, CHU Qiang, XIAO Chuanqiang. Adding the distributed PD analysis during high voltage cable completion inspection and acceptance test[J]. High Voltage Engineering, 2011, 37(Supplement): 94-97.