陈秀娟,丁玉剑,朱艺颖. ±800 kV直流输电线路过电压、防雷及绝缘配合差异化设计研究[R]. 北京:中国电力科学研究院,2014. CHEN Xiujuan, DING Yujian, ZHU Yiying. Research on different design of ±800 kV UHVDC transmission lines by different overvoltage, lightning protection and insulation[R]. Beijing, China: China Electric Power Research Institute, 2014.
[2]
丁玉剑,于昕哲,朱艺颖,等. 哈密—郑州±800 kV 直流线路过电压和绝缘设计深化研究[R]. 北京:中国电力科学研究院,2012. DING Yujian, YU Xinzhe, ZHU Yiying, et al . Deeply research on overvoltage and insulation design of ±800 kV UHVDC transmission lines from Hami to Zhengzhou[R]. Beijing, China: Electric Power Research Institute, 2012.
[3]
葛 栋,丁玉剑,朱艺颖,等. 溪洛渡—浙西±800 kV直流线路过电压和绝缘配合设计深化研究[R]. 北京:中国电力科学研究院,2012. GE Dong, DING Yujian, ZHU Yiying, et al . Deeply research on overvoltage and insulation design of ±800 kV UHVDC transmission lines from Xiluodu to Zhexi[R]. Beijing, China: Electric Power Research Institute, 2012.
Jinzhuang, DAI Min, et al . Slow front overvoltage and insulation coordination of ±800 kV UHV DC transmission line[J]. High Voltage Engineering, 2009, 35(7):1509-1517.
[6]
陈锡磊,周 浩,王东举,等. 溪洛渡—浙西±800 kV特高压直流输电工程浙西换流站绝缘配合[J]. 电网技术,2012,36(2):7-12. CHEN Xilei, ZHOU Hao, WANG Dongju, et al . Insulation coordination for Zhexi converter station of ±800 kV DC power transmission project from Xiluodu to Zhexi[J]. Power System Technology, 2012, 36(2): 7-12.
[7]
陈锡磊,周 浩,王东举,等. 向家坝—上海±800 kV特高压直流工程直流滤波器过电压与绝缘配合研究[J]. 电力系统保护与控制,2012,40(3):95-104. CHEN Xilei, ZHOU Hao, WANG Dongju, et al . Study on overvoltage and insulation coordination of DC filter for ±800 kV UHVDC project from Xiangjiaba to Shanghai[J]. Power System Protection and Control, 2012, 40(3): 95-104.
Jinzhuang, ZHAO Jie. Study on the overvoltage and insulation coordination of Yunnan-Guangdong ±800 kV UHVDC transmission system[J]. Southern Power System Technology, 2009, 3(2): 18-22.
[10]
韩永霞,李立浧,陈辉祥,等. 直流保护策略对特高压换流站过电压与绝缘配合影响的仿真分析[J],高电压技术,2012,38(2):316-321. HAN Yongxia, LI Licheng, CHEN Huixiang, et al . Simulation analysis of influence of DC protection on the overvoltage and insulation coordination of UHVDC converter stations[J]. High Voltage Engineering, 2012, 38(2): 316-321.
[11]
阮 羚,谷山强,赵 淳,等. 鄂西三峡地区220 kV线路差异化防雷技术与策略[J]. 高电压技术,2012,38(1):157-166. RUAN Ling, GU Shanqiang, ZHAO Chun, et al . Technology and strategy of differentiated lightning protection for 220 kV transmission line in Three Gorges Area of Western Hubei[J]. High Voltage Engineering, 2012, 38(1): 157-166.
[12]
刘振亚. 特高压直流输电系统过电压及绝缘配合[M]. 北京:北京:中国电力出版社,2009:94-102. LIU Zhenya. Overvoltage and insulation coordination of UHVDC transmission system[M]. . Beijing, China: China Electric Power Press, 2009:94-102.
[13]
张刘春,张翠霞, 张搏宇,等. ±800 kV级联多端特高压直流输电工程的绝缘配合[J]. 电网技术,2012,36(12):60-65. ZHANG Liuchun, ZHANG Cuixia, ZHANG Boyu, et al . Insulation coordination of ±800 kV cascaded multi-terminal DC transmission project[J]. Power System Technology, 2012, 36(12): 60-65.
[14]
International Electrotechincal Commission. IEC 60071-1:2006 Insulation coordination, part 1: definitions, principles and rules[S], 2006.
[15]
International Electrotechincal Commission. IEC 60071-2:1996 Insulation co-ordination, part 2: application guide[S], 1996.
[16]
IEEE Std 1862 TM —2014 IEEE recommended practice for overvoltage and insulation coordination of transmission systems at 1 000 kV AC and above[S], 2014.
[17]
International Electrotechincal Commission. IEC 60071-5:2002 Procedures for high-voltage direct current(HVDC) converter stations[S], 2002.
[18]
GB/T 311.3—2007 绝缘配合第3部分:高压直流换流站绝缘配合程序[S],2007. GB/T 311.3—2007 Insulation coordination, part 3: procedures for high-voltage direct current (HVDC) converter stations[S], 2007.
[19]
Q/GDW 144—2006 ±800 kV特高压直流换流站过电压保护和绝缘配合导则[S]. 北京:中国电力出版社,2006. Q/GDW 144—2006 Guide for overvoltage protection and insulation coordination of ±800 kV UHV DC converter station[S]. Beijing, China: China Electric Power Press, 2006.