全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

生物法-人工湿地组合工艺处理小城镇混合污水研究

Keywords: 生物法,组合式人工湿地,混合污水,去除速率常数

Full-Text   Cite this paper   Add to My Lib

Abstract:

为适应小城镇污水处理高效、低耗、管理简单的要求,开展了生物法(水解酸化/生物接触氧化)-人工湿地组合工艺(A/BCO-CW)处理小城镇片区混合污水的研究。结果表明,A/BCO系统在停留时间为3~6h条件下,对悬浮物和有机物有高的去除效率,COD、BOD5和TSS去除率分别达到63.1%、67.7%和66.2%,避免了人工湿地堵塞和提高处理效率,减少了所需湿地面积44%。全年运行结果表明,在0.30~0.59m/d水力负荷率下,垂直流-表面流-水平潜流人工湿地组合系统对COD、BOD5和TSS平均去除负荷达9.4、5.1和7.2g/(m2·d)(42%、71.2%和85.2%);COD、BOD5去除速率常数为74.6±12.1m/y、166±30.5m/y,这些数值均处于文献中k值范围的高量程内。A/BCO-人工湿地系统对COD、BOD5和TSS具有好的处理效果,出水水质能够稳定达到《地表水环境质量标准》(GB3838-2002)的IV类水标准,2种处理方法有效组合起来,所开发的低成本、高效率、可持续运行的城镇废水处理组合系统,将会在实际应用尤其是高有机负荷污水处理中发挥良好效用。

References

[1]  Association I.W,Constructed Wetlands for Pollution Control,Processes,Design,and Operation,London;IWA Publishing,2000.
[2]  Vymazal J,The use of sub-surface constructed wetlands for wastewater treatment in the Czech Republic:10 years experience,Ecol Eng,2002(5).
[3]  Wiessner A,Kuschk P,Stottmeister U,Treating a lignite pyrolysis wastewater in a constructed subsurface flow wetland,Water Research,1999(5).
[4]  Vrhovgek D,Kukanja V,Tjasa B,Constructed wetland (CW) for industrial wastewater treatment,Water Research,1996(10).
[5]  Dunne E.J,Culleton N,Donovan G.O,An integrated constructed wetland to treat contaminants and nutrients from dairy farmyard dirty water,Ecol Eng,2005(3).
[6]  李羚,人工湿地处理污水技术及其在我国的应用现状和对策,现代城市研究,2004(12).
[7]  Caselles-Osorio A,Puigagut J,Segu E,Solids accumulation in six full-scale subsurface flow constructed wetlands,Water Research,2007(6).
[8]  Kivaisi A.K,The potential for constructed wetlands for wastewater treatment and reuse in developing countries:A review,Ecol Eng,2001(4).
[9]  Barros P,Ruiz I,Soto M,Performance of an anaerobic digester-constructed wetland system for a small community,Ecol Eng,2008(2).
[10]  Alvarez J.A,Ruiz I,Soto M,Anaerobic digester as a pretreatment for constructed wetlands,Ecol Eng,2008(1).
[11]  崔理华,楼倩,周显宏,两种复合人工湿地系统对东莞运河污水的净化效果,生态环境学报,2009(5).
[12]  谭洪新,刘艳红,周琪,添加碳源对潜流+表面流组合湿地脱氮除磷的影响,环境科学,2007(6).
[13]  Rousseau D.P.L,Vanrolleghem P.A,Pauw N.D,Model-based design of horizontal subsurface flow constructed treatment wetlands:A review,Water Research,2004(6).
[14]  Kantawanichkul S,Kladprasert S,Brix H,Treatment of high-strength wastewater in tropical vertical flow constructed wetlands planted with Typha angustifolia and Cyperus involucratus,Ecol Eng,2009(2).
[15]  Kadlec R.H,The inadequacy of first-order treatment wetland models,Ecol Eng,2000(1).
[16]  Kadlec R,Knight R,Treatment Wetlands,CRC Press,1996.
[17]  Yang Y,Xu Z,Hu K,Removal efficiency of the constructed wetland:Wastewater treatment system at Bainikeng,Shenzhen,China,Water Science and Technology,1995(3).
[18]  Shi L,Wang B.Z,Cao X.D,Performance of a subsurface-flow constructed wetland in southern China,Journal of Environmental Sciences,2004(3).
[19]  张翔凌,张晟,付贵萍,复合垂直流人工湿地用于湖滨型校园湖泊水体修复,中国给水排水,2008(4).
[20]  Cooper P.F,Job G.D,Green M.B,Reed Beds and Constructed Wetlands for Wastewater Treatment,WRc Publications;Medmenham,Marlow,UK,1996.
[21]  Dahab M.F,Surampalli R.Y,Subsurface-flow constructed wetlands treatments in the plains;Five years of experience,Water Science and Technology,2001(11).
[22]  Vymazal J,Horizontal subsurface-flow and hybrid constructed wetlands systems for wastewater treatment,Ecol Eng,2005(5).
[23]  国家环境保护局<水和废水监测分析方法>编委会,水和废水监测分析方法,北京:中国环境科学出版社,2002.
[24]  Puigagut J,Villasenor J,Subsurface-flow constructed wetlands in Spain for the sanitation of small communities;A comparative study,Ecol Eng,2007(4).
[25]  付贵萍,吴振斌,张晟,构建湿地堵塞问题的研究,环境科学,2004(3).

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133