Shen W,Hao Q,Yoon H J,Applications of agent-based systems in intelligent manufacturing:an updated review,Advanced Engineering Informatics,2006(4).
[2]
Kouiss K,Pierreval H,Mebarki N,Using multi-agent architecture in FMS for dynamic scheduling,Journal of Intelligent Manufacturing,1997(1).
[3]
Usher J M,Negotiation-based routing in job shops via collaborative agents,Journal of Intelligent Manufacturing,2003(5).
[4]
Aydin M E,Fogarty T C,A simulated annealing algorithm for multi-agent systems:a job-shop scheduling application,Journal of Intelligent Manufacturing,2004(6).
[5]
Babayan A,He D,A distributed scheduling methodology for a two-machine flowshop using cooperative interaction via multiple coupling agents,International Journal of Production Research,2004(4).
[6]
Lenstra J K,Rinnooy Kan AHG,Brucker P,Complexity of machine scheduling problems,Annals of Discrete Mathematics,1977.
[7]
Koulamas C,Kyparisis G L,Makespan minimization on uniform parallel machines with release times,European Journal of Operational Research,2004(1).
[8]
李凯.朱羽.杨善林 含有到达时间的最大完成时间同类机调度算法 [J].-系统仿真学报2008(2)
[9]
Smith R G,The contract net protocol:high-level communication and control in a distributed problem solver,IEEE Transactions on Computers C,1980(12).
[10]
Bruccoleri M,Amico M,Perrone G,Distributed intelligent control of exceptions in reconfigurable manufacturing systems,International Journal of Production Research,2003(7).
[11]
Blazewicz J,Ecker K,Schmidt G,Scheduling in computer and manufacturing systems,Beilin:Springer-Verlag,1993.