C. Schmitt ;G. Pluvinage ;E. Hadj-Taieb,Water pipeline failure due to water hammer effects,Fatigue & Fracture of Engineering Materials & Structures?,2006, 29(12).
Jayaraj Kochupillai ;N. Ganesan ;Chandramouli Padmanabhan,A new finite element formulation based on the velocity of flow for water hammer problems,International Journal of Pressure Vessels and Piping?,2005, 82(1).
[4]
Wenxi Tian ;G.H. Su ;Gaopeng Wang ;Suizheng Qiu ;Zejun Xiao,Numerical Simulation And Optimization On Valve-induced Water Hammer Characteristics For Parallel Pump Feedwater System,Annals of Nuclear Energy?,2008, 35(12).
[5]
Abbasi A;Sabbagh-Yazdi S R;Wegian F M,Accurate water hammer pressure modeling for automatic modification of stress distribution along multi-segment pipelines,Water Science and Technology:Water Supply-WSTWS,2009(3).
[6]
Ansari;Mohammad R;Davari,Numerical analysis of pipeline equipment effect on water hammer using characteristic method,ASME,2003.